PRPL202202892
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Plumbing Rough-in Inspection | Partial Pass | 5/27/2022 (8:00 - 10:00) | 5/27/2022 (AM) | 05/27/2022 |
Corrections:
Miscellaneous/Other
Comment Only
05/27/2022
Visual on setting and under ground piping for sewage ejector
|
||||
Plumbing Rough-in Inspection | Not Ready | 6/15/2022 (12:30 - 2:30) | 6/15/2022 (PM) | 06/15/2022 |
Corrections:
Miscellaneous/Other
Carried Forward
06/15/2022
Visual on setting and under ground piping for sewage ejector
|
||||
Plumbing Rough-in Inspection | Partial Pass | 6/17/2022 (12:30 - 2:30) | 6/17/2022 (PM) | 06/17/2022 |
Corrections:
Miscellaneous/Other
Comment Only
06/17/2022
Air test on all under ground except the sanitary for bathrooms.
Sewage ejector
Elevator sump
Drain tile sump
|
||||
Plumbing Rough-in Inspection | Partial Pass | 6/21/2022 (12:30 - 2:30) | 6/21/2022 (PM) | 06/21/2022 |
Corrections:
Miscellaneous/Other
Comment Only
06/21/2022
Visual on setting and under ground piping for sewage ejector
|
||||
Miscellaneous/Other
Comment Only
06/21/2022
Air test on unfortunately bathroom and storm shelter
|
||||
Plumbing Rough-in Inspection | Partial Pass | 10/5/2022 (12:30 - 2:30) | 10/5/2022 (PM) | 10/05/2022 |
Corrections:
Miscellaneous/Other
Comment Only
10/05/2022
Visual on underground north east corner
|
||||
Plumbing Rough-in Inspection | Partial Pass | 10/6/2022 (12:30 - 2:30) | 10/6/2022 (PM) | 10/06/2022 |
Corrections:
Miscellaneous/Other
Comment Only
10/06/2022
Visual on underground for flammable waste
|
||||
Plumbing Rough-in Inspection | Partial Pass | 10/7/2022 (12:30 - 2:30) | 10/7/2022 (PM) | 10/07/2022 |
Corrections:
Miscellaneous/Other
Comment Only
10/07/2022
3 lb air test on 8” and 10” storm main
|
||||
Plumbing Rough-in Inspection | Partial Pass | 10/11/2022 (12:30 - 2:30) | 10/11/2022 (PM) | 10/11/2022 |
Corrections:
Miscellaneous/Other
Comment Only
10/11/2022
Visual on underground for bathrooms on 1st level west side.
Visual on piping for flam tank
visual on storm
|
||||
Plumbing Rough-in Inspection | Partial Pass | 10/12/2022 (12:30 - 2:30) | 10/12/2022 (PM) | 10/12/2022 |
Corrections:
Miscellaneous/Other
Comment Only
10/12/2022
Air test on storm sewer
Visual on shower and lav rough-ins.
Future air test
Visual on installation of flam tank, not piped yet
|
||||
Plumbing Rough-in Inspection | Partial Pass | 10/13/2022 (12:30 - 2:30) | 10/13/2022 (PM) | 10/13/2022 |
Corrections:
Miscellaneous/Other
Comment Only
10/13/2022
Air test on underground sanitary for bathrooms
|
||||
Plumbing Rough-in Inspection | Partial Pass | 10/14/2022 (12:30 - 2:30) | 10/14/2022 (PM) | 10/14/2022 |
Corrections:
Miscellaneous/Other
Comment Only
10/14/2022
Tanks buried, underground main facing west.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 12/7/2022 (12:30 - 2:30) | 12/7/2022 (PM) | 12/07/2022 |
Corrections:
Miscellaneous/Other
Comment Only
12/07/2022
Visual on west set of trench drains
Future air test
Partial visual on Storm drains
Consult with Duke about installation of PRV. Possibly contact the architect.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 12/8/2022 (12:30 - 2:30) | 12/8/2022 (PM) | 12/09/2022 |
Corrections:
Miscellaneous/Other
Comment Only
12/09/2022
Visual on all under ground for the trench drains.
R Ames spoke with the plumbing engineer from EDI, Sandy, who drew the plan. She approved elimination of the PRV valves. Sandy will send change order to architects please email a copy of the change order to R Ames at: rames@bloomingtonmn.gov
Thanks Kayla
|
||||
Plumbing Rough-in Inspection | Partial Pass | 12/9/2022 (12:30 - 2:30) | 12/9/2022 (PM) | 12/09/2022 |
Corrections:
Miscellaneous/Other
Comment Only
12/09/2022
Air test on all piping for trench drains
|
||||
Plumbing Rough-in Inspection | Not Ready | 12/12/2022 (12:30 - 2:30) | 12/12/2022 (PM) | 12/12/2022 |
Corrections:
Miscellaneous/Other
Comment Only
12/12/2022
Nothing to inspect since Friday.
Not necessary
|
||||
Plumbing Rough-in Inspection | Partial Pass | 1/27/2023 (12:30 - 2:30) | 1/27/2023 (PM) | 01/27/2023 |
Corrections:
Miscellaneous/Other
Comment Only
01/27/2023
Air tests on storm drains. 6 INCH holding 3 PSI
Adding restraints and sway bars.
Will walk through again when supports are in place
|
||||
Plumbing Rough-in Inspection | Partial Pass | 2/2/2023 (12:30 - 2:30) | 2/2/2023 (PM) | 02/02/2023 |
Corrections:
Miscellaneous/Other
Comment Only
02/02/2023
Visual on all waste and vent for 2nd level bathrooms and mop sinks on 1st floor. Visual on ice maker boxes and break room sink.
Future air test
|
||||
Plumbing Rough-in Inspection | Not Ready | 2/8/2023 (10:00 - 12:00) | 2/8/2023 (AM) | 02/08/2023 |
2/8: CANCELED and rescheduling for tomorrow. thanks- VM | ||||
Plumbing Rough-in Inspection | Partial Pass | 2/9/2023 (12:30 - 2:30) | 2/9/2023 (PM) | 02/09/2023 |
Corrections:
Miscellaneous/Other
Comment Only
02/09/2023
Air test on remaining waste and vent.
Storm tests when weather permitting
|
||||
Plumbing Rough-in Inspection | Partial Pass | 3/2/2023 (Afternoon) | 3/2/2023 (PM) | 03/02/2023 |
Corrections:
Miscellaneous/Other
Comment Only
03/02/2023
Air test on storm water system ok to secure and run
|
||||
Plumbing Rough-in Inspection | Not Ready | 3/3/2023 (12:30 - 2:30) | 3/3/2023 (PM) | 03/03/2023 |
Corrections:
Miscellaneous/Other
Comment Only
03/02/2023
Air test on storm water system
Ok to secure and let run
|
||||
Plumbing Rough-in Inspection | Partial Pass | 3/6/2023 (12:30 - 2:30) | 3/6/2023 (PM) | 03/06/2023 |
Corrections:
Miscellaneous/Other
Comment Only
03/06/2023
Restraints and hangers on roof drains inspected
Mechanical room waste in ceiling inspected
|
||||
Plumbing Rough-in Inspection | Partial Pass | 3/24/2023 (10:00 - 12:00) | 3/24/2023 (AM) | 03/24/2023 |
Corrections:
Miscellaneous/Other
Comment Only
03/24/2023
Shower pan flood tests
|
||||
Progress Inspection | Partial Pass | 6/9/2023 (8:00 - 10:00) | 6/9/2023 (AM) | 06/09/2023 |
Corrections:
Miscellaneous/Other
Comment Only
06/09/2023
Manometer test ok. Partial visual finale inspection ok. Need to complete a couple sinks.
|
||||
Plumbing Final Inspection | Passed w/ Conditions | 6/15/2023 (2:30 - 3:30) | 6/15/2023 (PM) | 06/15/2023 |
Corrections:
Miscellaneous/Other
Comment Only
06/15/2023
Plumbing final inspection ok.
Need to install non-potable water tags on South wall outside hose bib and west side roof water hydrant. Also, need to install non potable water stickers at four hose reels in garage.
|
||||
Plumbing Final Inspection | Passed | 6/14/2023 (12:30 - 2:30) | 06/16/2023 | |
Corrections:
Miscellaneous/Other
Comment Only
06/16/2023
Location: Decontamination Room, serving gear washing machine
- RPZ Watts 1-1/2" Model 919QT Serial #28757 Cold Water tested 5/3/23.
- RPZ Watts 1-1/2" Model 919QT Serial #28755 Hot Water tested 5/3/23.
Location: Janitor Closet,serving truck bay hose reels and west roof hydrant
- RPZ Watts 3" Model 957RP Serial UK0038 tested 5/3/23.
Location: Sprinkler riser/ water service room, serving irrigation
- RPZ Watts 2" Model 919QT Serial #42168 tested 5/3/23.
|