PRAL202315644
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Fire Inspection Final | Partial Pass | 12/29/2023 (12:30 - 2:30) | 12/29/2023 (PM) | 12/29/2023 |
Based on the devices that were working, a 10 day temp occupancy was given. The fire alarm system in all areas of the building shall be in working and pretested prior to acceptance testing being scheduled. A new fire alarm permit application is required for the new work. | ||||
Acceptance Test Inspection | Partial Pass | 12/29/2023 (12:30 - 2:30) | 12/29/2023 (PM) | 12/29/2023 |
Because of the addition of new devices the 2 horn strobes on the 2nd floor north end did not work. 1 newer device was taken from 3rd floor to replace 1 of the 2 bad devices. LVC techs on site are aware and working on the problem. | ||||
Acceptance Test Inspection | Partial Pass | 1/5/2024 | 01/05/2024 | |
1st - 3rd floors approved. P1 and P2 need additional notification. | ||||
Fire Inspection Final | Failed | 1/5/2024 | 01/05/2024 | |
Acceptance Test Inspection | Passed | 01/29/2024 | ||
Fire Inspection Final | Passed | 01/29/2024 |