PRBD201700181
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Fire Inspection Final | Pending | |||
Building Final Inspection | Pending | |||
Framing Inspection | Partial Pass | 4/27/2017 (Afternoon) | 4/10/2017 | 04/10/2017 |
Corrections:
Miscellaneous/Other
Comment Only
04/10/2017
Walls to bathroom at hallway approved to cover. Leave open areas designated to contractor for viewing of fireproofing patching,( inside of structural steel at columns and 2 outer wall areas). Will swing back on 4/11 to view patching prior to covering.
|
||||
Framing Inspection | Partial Pass | 4/27/2017 | 04/27/2017 | |
Corrections:
Miscellaneous/Other
Comment Only
04/27/2017
Fireproofing has been patched... approved.
Framing in bathroom is approved, pending electrical and sprinkler inspection. Ceiling penetrations in Air Museum need to be addressed, contractor and hotel owner to work out fix for the floor areas in 2 locations that need to be rated for 2 hours. See pictures.
|
||||
Framing Inspection | Passed | 06/02/2017 | ||
Corrections:
Miscellaneous/Other
Comment Only
06/02/2017
2 hour assemblies installed at the floor openings of air museum.... inspected the proceeds by pictures and the final is approved.
|
||||
Building Final Inspection | Partial Pass | 06/02/2017 | ||
Corrections:
Miscellaneous/Other
Comment Only
06/02/2017
Install signage to bathrooms. Men's bathroom mirror height to be lowered to 40" to reflective edge measured from floor. Air museum to have sprinklers inspected by fire inspection.
|
||||
Building Final Inspection | Failed | 09/29/2017 | ||
Corrections:
Miscellaneous/Other
Comment Only
09/29/2017
Mirror height in men's bathroom has been corrected to comply with accessibility code requirements. The mirrors in the woman's bathroom were changed out and are to high so as not to comply with Accessibility code requirements. Contractor to correct this item and call for a reinspection final with this permit.
|
||||
Building Final Inspection | Failed | 10/06/2017 | ||
Corrections:
Miscellaneous/Other
Comment Only
10/06/2017
The description as noted in the permit covers both bathrooms on the 3rd floor, the contractor did not do any work in the woman’s bathroom, only the men’s. The correction to adjust the mirror height in the woman’s bathroom is not required as this is an existing condition and no work was done in this bathroom. This permit is open pending the final for the sprinkler permit and fire sign off.
|