Summary

PRBD201700489
Building
Finaled
G&I VIII WF PLAZA LLC
Alteration/Remodel
Not Required
Interior remodel - first floor and common area.
02/13/2017
03/30/2017
09/05/2021
10/09/2017

Locations

Permits

Permit Number: PRBD201700489

Building
Finaled
03/30/2017
09/05/2021

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Footing Inspection Passed 5/16/2017 (8:00 - 10:00) 5/16/2017 05/16/2017
Corrections:


Miscellaneous/Other
Comment Only
05/16/2017
2 stoop footings as per plan. Ok to place concrete

Footing Inspection Passed 5/22/2017 (Morning) 5/22/2017 05/22/2017
rebar - pouring at 11-noon
Corrections:


Miscellaneous/Other
Comment Only
05/22/2017
Foundation: A) NEW south and north stoop, corefill for CMU block. Special inspection by Braun Intertec. OK to proceed.

Framing Inspection Passed w/ Conditions 6/19/2017 (12:30 - 2:30) 6/19/2017 06/19/2017
Fire Inspection Final Partial Pass 9/1/2017 (12:30 - 2:30) 9/1/2017 09/01/2017
Corrections:


Exit signage not installed/tested.
Outstanding
09/01/2017
Exit signage not installed/tested.

Building Final Inspection Partial Pass 9/1/2017 (12:30 - 2:30) 9/1/2017 09/01/2017
Need exit sign at (south exit under remodeled canopy with new doors and glass. Need Special inspections summary report for 2 stoop w/concrete footings w/reinforcement and test on intemesent fireproofing columns insid south canopy. Scope of work -New stairway and handrail, exterior North courtyard with table to gas fireplace, interior high wall gas fireplace.
Fire Inspection Final Passed 10/9/2017 (8:00 - 10:00) 10/9/2017 10/09/2017
Special Inspection Passed 10/9/2017 (8:00 - 10:00) 10/9/2017 10/09/2017
Special inspections report for concrete, reinforcement, fire proofing, welding, bolting.
Corrections:


Miscellaneous/Other
Outstanding
10/09/2017
Final building - add exit sigh at main lobby south entree entry vestibule. Please send email for special inspections summary letter to Brian Post at city of Bloomington to bpost@bloomingtonmn.gov

Building Final Inspection Passed 10/9/2017 (8:00 - 10:00) 10/9/2017 10/09/2017