Summary

PRBD201700616
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Remodel
Not Required
Demolish and replace existing bathrooms on 1st floor east.
02/16/2017
03/14/2017
06/03/2018
12/05/2017

Locations

Permits

Permit Number: PRBD201700616

Building
Finaled
03/14/2017
06/03/2018

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 4/3/2017 (8:00 - 10:00) 4/3/2017 04/03/2017
Corrections:


Miscellaneous/Other
Comment Only
04/03/2017
Walls at bathroom hallway, and exit passageway/ stair... ok to cover

Framing Inspection Passed 4/19/2017 (10:00 - 12:00) 4/19/2017 04/19/2017
Corrections:


Miscellaneous/Other
Comment Only
04/19/2017
Walls and ceiling approved to cover

Fire Inspection Final Failed 7/27/2017 (12:30 - 2:30) 7/27/2017 07/27/2017
Building Final Inspection Failed 7/27/2017 (12:30 - 2:30) 7/27/2017 07/27/2017
Corrections:


Miscellaneous/Other
Comment Only
07/27/2017
Bathrooms are Accessibility compliant and once approved by fire inspector can be opened for public use. The mop sink closet needs to have the hole in floor filled, and the piping for sink and drain firestopped from below. The stairwell has a hole from removed pipe that has to be properly patched and one coat of tape on seams for smoke and gas seal. The piping in the entry of passageway needs to be fire stopped at both locations of piping.

Building Final Inspection Partial Pass 7/28/2017 (10:00 - 12:00) 7/28/2017 07/28/2017
Corrections:


Miscellaneous/Other
Comment Only
07/28/2017
Fire inspection was approved, the bathrooms are approved to open for public use. Corrections still remain with the areas mentioned, as per the inspection dated 7/27/17 with the work associated to the scope of this permit.

Fire Inspection Final Passed 12/05/2017
Corrections:


Miscellaneous/Other
Comment Only
12/05/2017
Fire final completed on 7/27/17 as per notes in Inspections

Building Final Inspection Passed 12/05/2017
Corrections:


Miscellaneous/Other
Comment Only
12/05/2017
Fire final completed on 7/27/17, all fire stops viewed and completed for what remained with this project.