PRBD201700913
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Partial Pass | 3/8/2017 (12:30 - 2:30) | 3/8/2017 | 03/08/2017 |
Corrections:
Miscellaneous/Other
Comment Only
03/08/2017
12th floor south women's bathroom. Firestops and framing, Approved to cover.
|
||||
Framing Inspection | Partial Pass | 03/14/2017 | ||
Corrections:
Miscellaneous/Other
Comment Only
03/14/2017
Patched Fire proofing at beams, and column wraps for 3 hour protection verified as for the install design for the UL assembly. Column wraps are at the second layer with the metal framing angles and wire wraps installed... two layers of gypsum needed for completion of the protection.
|
||||
Framing Inspection | Partial Pass | 03/21/2017 | ||
Corrections:
Miscellaneous/Other
Comment Only
03/21/2017
Column wraps completed to the 3hr. Protection. Floor penetrations are now addressed as per the Hilti design judgement. Approved to cover walls to complete bathroom.
|
||||
Framing Inspection | Partial Pass | 3/29/2017 (12:30 - 2:30) | 3/29/2017 | 03/29/2017 |
Corrections:
Miscellaneous/Other
Comment Only
03/29/2017
Framing and firestops inspection for 11th floor bathrooms... Approved, A.E.T. Inspector to view installation of the 4 remaining firestops as per the required inspection contract.
|
||||
Progress Inspection | Partial Pass | 4/6/2017 (12:30 - 2:30) | 4/6/2017 | 04/06/2017 |
12th floor bathroom final. | ||||
Corrections:
Miscellaneous/Other
Comment Only
04/06/2017
Add smoke seal to rated door at shaft in women's bath on 12th fl. Install signage to both entry's of each bathroom. Hook/holder at ambulatory stall in men's and women's baths to be at 48". Complete threshold at each entry to bathrooms. Will recheck prior to opening bathrooms for use.
|
||||
Framing Inspection | Partial Pass | 04/10/2017 | ||
Corrections:
Miscellaneous/Other
Comment Only
04/10/2017
Bathrooms on 12th floor are approved for final, items from previous inspection are completed.
|
||||
Framing Inspection | Partial Pass | 4/28/2017 (10:00 - 12:00) | 4/28/2017 | 04/28/2017 |
Corrections:
Miscellaneous/Other
Comment Only
04/28/2017
Final inspection on 11th floor bathrooms approved. Framing and firestops on 10th floor approved.
|
||||
Framing Inspection | Partial Pass | 6/30/2017 (10:00 - 12:00) | 05/08/2017 | |
Corrections:
Miscellaneous/Other
Comment Only
05/08/2017
South vestibule ceiling and small wall section.... approved.
|
||||
Framing Inspection | Partial Pass | 5/19/2017 (10:00 - 12:00) | 5/19/2017 | 05/19/2017 |
Corrections:
Miscellaneous/Other
Comment Only
05/19/2017
9th floor north bathroom framing and fire stops approved. Recheck south bathroom at Monday inspection( 5/22/17)
|
||||
Framing Inspection | Partial Pass | 6/30/2017 (10:00 - 12:00) | 05/22/2017 | |
Corrections:
Miscellaneous/Other
Comment Only
05/22/2017
Firestops at through floor penetrations of south bathroom 9th floor approved . Ok to cover.
|
||||
Progress Inspection | Partial Pass | 6/1/2017 (10:00 - 12:00) | 6/1/2017 | 06/01/2017 |
Corrections:
Miscellaneous/Other
Comment Only
06/01/2017
10th floor men's and women's and mothers room approved for final pending install of last grab bars at accessible stalls. Grab bars are marked out and in process of installation.
|
||||
Progress Inspection | Partial Pass | 6/20/2017 (8:00 - 10:00) | 6/20/2017 | 06/20/2017 |
Corrections:
Miscellaneous/Other
Comment Only
06/20/2017
Bathroom (s) on 8th floor framing and firecaulking approved. 9th floor bathrooms approved for final.
|
||||
Progress Inspection | Partial Pass | 6/30/2017 (10:00 - 12:00) | 6/30/2017 | 06/30/2017 |
Corrections:
Miscellaneous/Other
Comment Only
06/30/2017
13th floor bathrooms... firestops and framing approved.
|
||||
Framing Inspection | Partial Pass | 7/11/2017 (10:00 - 12:00) | 7/11/2017 | 07/11/2017 |
Corrections:
Miscellaneous/Other
Comment Only
07/11/2017
7th floor framing and firestops in both bathroom groups approved. Covering walls and ceilings approved pending fire and electrical inspection. Fireproofing to be patched at beam above door entry to maintain existing thickness and fire rating.
|
||||
Progress Inspection | Partial Pass | 7/21/2017 (10:00 - 12:00) | 7/21/2017 | 07/21/2017 |
Corrections:
Miscellaneous/Other
Comment Only
07/21/2017
8th floor men's and women's bathrooms approved for final and tennant use.
|
||||
Progress Inspection | Partial Pass | 7/26/2017 (10:00 - 12:00) | 07/26/2017 | |
13th floor restroom final | ||||
Corrections:
Miscellaneous/Other
Comment Only
07/26/2017
13th floor bathrooms approved for public use.
|
||||
Framing Inspection | Partial Pass | 8/9/2017 (10:00 - 12:00) | 8/9/2017 | 08/09/2017 |
Corrections:
Miscellaneous/Other
Comment Only
08/09/2017
Framing and firestops approved in both bathrooms and lactation room. Verbal correction to continue layer of gypsum behind framing and above ceiling at the columns for rating protection of columns.
|
||||
Building Final Inspection | Partial Pass | 8/9/2017 (10:00 - 12:00) | 8/9/2017 | 08/09/2017 |
Corrections:
Miscellaneous/Other
Comment Only
08/09/2017
7th floor bathrooms approved for public use.
|
||||
Framing Inspection | Partial Pass | 08/22/2017 | ||
Corrections:
Miscellaneous/Other
Comment Only
08/22/2017
1st floor bathrooms and elevator lobby framing and firestops.... approved for gypsum cover pending fire sprinkler inspection.
|
||||
Framing Inspection | Partial Pass | 8/31/2017 (12:30 - 2:30) | 8/31/2017 | 08/31/2017 |
Corrections:
Miscellaneous/Other
Comment Only
08/31/2017
Framing and firestops approved on 5th floor bathrooms. Contractor to send picture verification of 4 holes to be filled with concrete and second layer of gypsum to top of column and header at the cut framing In men's bathroom.
|
||||
Progress Inspection | Partial Pass | 9/14/2017 (12:30 - 2:30) | 9/14/2017 | 09/14/2017 |
Corrections:
Miscellaneous/Other
Comment Only
09/14/2017
Men's and women's bathrooms on basement level, and 6th floor including the lactation room on 6th. Approved
|
||||
Framing Inspection | Partial Pass | 9/28/2017 (8:00 - 10:00) | 9/28/2017 | 09/28/2017 |
Corrections:
Miscellaneous/Other
Comment Only
09/28/2017
Bathrooms on 14th floor framing and firestops... approved. Sprinkler inspection needed, no covering till inspected.
|
||||
Progress Inspection | Partial Pass | 10/3/2017 (12:30 - 2:30) | 10/3/2017 | 10/03/2017 |
Corrections:
Miscellaneous/Other
Comment Only
10/03/2017
5th floor bathrooms final approved to open for use. Accessibility compliant.
|
||||
Framing Inspection | Partial Pass | 10/6/2017 (8:00 - 10:00) | 10/6/2017 | 10/06/2017 |
Corrections:
Miscellaneous/Other
Comment Only
10/06/2017
Framing and firestops in both bathrooms and “mothers room” on 4th floor approved. Contractor to repair the broken out masonry wall of the elevator shaft located in the woman’s bathroom to maintain the rating of shaft. Already went through the method of repair with contractor and they will provide pictures of repair prior to covering the furred walls. Approved to cover walls and ceilings.
|
||||
Progress Inspection | Partial Pass | 10/17/2017 (12:30 - 2:30) | 10/17/2017 | 10/17/2017 |
Corrections:
Miscellaneous/Other
Comment Only
10/17/2017
14 th floor bathrooms approved to open for public use.
|
||||
Framing Inspection | Partial Pass | 10/27/2017 (10:00 - 12:00) | 10/27/2017 | 10/27/2017 |
Corrections:
Miscellaneous/Other
Comment Only
10/27/2017
3rd floor north and south bathrooms... firestops and framing approved.
|
||||
Progress Inspection | Partial Pass | 10/31/2017 (12:30 - 2:30) | 10/31/2017 | 10/31/2017 |
Corrections:
Miscellaneous/Other
Comment Only
10/31/2017
5th floor bathrooms ( men’s and women’s) approved for use... mcgough to install the accessible signage once walls are prepped and finished, bathrooms to be marked temporarily till signage installed.
Mothers room to be inspected after completion.
|
||||
Framing Inspection | Partial Pass | 11/6/2017 (10:00 - 12:00) | 11/6/2017 | 11/06/2017 |
Corrections:
Miscellaneous/Other
Comment Only
11/06/2017
2nd floor bathrooms framing and fire-stops approved. 2 holes in floors to be filled with concrete, provide pictures to be sure they are filled.
|
||||
Framing Inspection | Partial Pass | 11/22/2017 (8:00 - 10:00) | 11/22/2017 | 11/22/2017 |
Corrections:
Miscellaneous/Other
Comment Only
11/22/2017
Unisex bathroom on 1st floor, women’s north bathroom, and men’s north bathroom... framing and firestops approved. Note: install access for junction box at ceiling of unisex and shutoff valves in wall at bathrooms.
|
||||
Progress Inspection | Partial Pass | 11/30/2017 (10:00 - 12:00) | 11/30/2017 | 11/30/2017 |
Corrections:
Miscellaneous/Other
Comment Only
11/30/2017
3rd floor women’s bathrooms and men’s bathroom approved for final.
|
||||
Framing Inspection | Partial Pass | 12/7/2017 (10:00 - 12:00) | 12/7/2017 | 12/07/2017 |
Corrections:
Miscellaneous/Other
Comment Only
12/07/2017
Level 2 bathrooms approved for opening for use, pending completion of some minor items.
|
||||
Building Final Inspection | Partial Pass | 12/18/2017 (8:00 - 10:00) | 12/18/2017 | 12/18/2017 |
Corrections:
Miscellaneous/Other
Comment Only
12/18/2017
Bathrooms on 1st floor, men’s and women’s, and unisex bathrooms, approved for public use opening.
|
||||
Fire Inspection Final | Passed | 03/08/2018 | ||
Building Final Inspection | Passed | 03/08/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
03/08/2018
Final approved, all work and inspections completed.
|