Permit Application Status

PRBD201701964


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201701964
Building
Finaled
NORTH PAD DEVELOPMENT LLC
Alteration/Remodel
Business
Interior Office Build-Out
03/30/2017
04/21/2017
10/02/2020
08/07/2017

Locations

Permits

Permit Number: PRBD201701964

Building
Finaled
04/21/2017
10/02/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 5/23/2017 (12:30 - 2:30) 5/23/2017 05/23/2017
Corrections:


Miscellaneous/Other
Comment Only
05/23/2017
Wall framing approved to cover. Fire proofing to be patched at beam, contractor knows of location. Provide picture of missed firecaulking at electrical floor penetration.

Framing Inspection Partial Pass 6/12/2017 (8:00 - 10:00) 6/12/2017 06/12/2017
Corrections:


Miscellaneous/Other
Comment Only
06/12/2017
Hard lids approved to cover. Went through Exit signage layout with contractor and noted locations on plans.

Building Final Inspection Failed 7/24/2017 (8:00 - 10:00) 7/24/2017 07/24/2017
Corrections:


Miscellaneous/Other
Comment Only
07/24/2017
E.M. Lighting to be checked at next inspection prior to occupancy. Shelf mounted Microwave does not meet reach range for Accessibility, this can be installed if a counter microwave is provided. Exit signage is approved and installed to lead separate areas toward both exits. Interior doors will not be in till August. Provide balance report to Mechanical inspector. Approved to stock and setup space. To occupy space all trades inspections to be completed along with fire marshal & building inspector to do final inspections.

Fire Inspection Final Passed w/ Conditions 7/25/2017 (10:00 - 12:00) 7/25/2017 07/25/2017
Corrections:


Fire extinguisher(s) needed.
Comment Only
07/25/2017
Fire extinguisher(s) need to be installed per plan. Building Inspector will follow, along with other items noted on Building Final

Building Final Inspection Passed w/ Conditions 7/26/2017 (12:30 - 2:30) 7/26/2017 07/26/2017
Corrections:


Miscellaneous/Other
Comment Only
07/26/2017
Final contingent upon viewing hardware on the meeting room door.

Building Final Inspection Passed 8/7/2017 (12:30 - 2:30) 8/7/2017 08/07/2017
Corrections:


Miscellaneous/Other
Comment Only
08/07/2017
Final for this permit approved for full occupancy of space.