Permit Application Status

PRBD201703349


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201703349
Building
Finaled
OXBORO THEME RETAIL CENTR
Alteration/Remodel
Not Required
Site work (curb ramp and parking), wall demo, new wall construction, new restrooms, new finishes, new ceiling, graphics and data/electrical. FedEx Office.
05/04/2017
07/06/2017
05/16/2018
11/17/2017

Locations

Permits

Permit Number: PRBD201703349

Building
Finaled

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Progress Inspection Not Ready 7/21/2017 (8:00 - 10:00) 7/21/2017 07/21/2017
Corrections:


Miscellaneous/Other
Comment Only
07/21/2017
Framing consultation for dismissing wall framing around the bar joist beam. C.O.B. is ok with boxing in beam and wall with sliptrack built under. This change does need to be approved with architect and verified at inspection.

Footing Inspection Passed w/ Conditions 8/21/2017 (12:30 - 2:30) 8/21/2017 08/21/2017
Corrections:


Miscellaneous/Other
Comment Only
08/21/2017
Footing and foundation wall is already poured and in place. Contractor took pictures of footing rebar. The plans do not show any detail for this section view or how this was installed. Contractor to have approval from engineer/architect for this installation.

Framing Inspection Failed 8/22/2017 (10:00 - 12:00) 8/22/2017 08/22/2017
Corrections:


Miscellaneous/Other
Comment Only
08/22/2017
Rescinding previous "approval with conditions" for the footing inspection dated 8/21/17. Engineer /architect to provide new documentation of the footing and foundation wall install that was not done to detail as what is on the plans. New detail and design needed to move forward with inspections for the ramp.

Framing Inspection Partial Pass 8/25/2017 (8:00 - 10:00) 08/22/2017
Corrections:


Miscellaneous/Other
Comment Only
08/22/2017
Interior framing at FedEx, above ceiling of the one side to encompass truss at diving wall between spaces. (See plan addendum.) approved to cover. Opposite side of wall and the wall infill to be inspected when ready.

Framing Inspection Passed w/ Conditions 8/25/2017 (8:00 - 10:00) 8/25/2017 08/25/2017
Corrections:


Miscellaneous/Other
Outstanding
08/25/2017
Framing - A) above ceiling, dimising wall to reduce existing FedEx space.B) call for above ceiling for electrical, low voltage, and fire sprinkler.

Framing Inspection Passed 9/13/2017 (10:00 - 12:00) 9/13/2017 09/13/2017
Corrections:


Miscellaneous/Other
Comment Only
09/13/2017
Approved framing on opposing side of dividing wall. Ok to cover.

Fire Inspection Final Failed 10/9/2017 (10:00 - 12:00) 10/9/2017 10/09/2017
Building Final Inspection Failed 10/9/2017 (10:00 - 12:00) 10/9/2017 10/09/2017
Corrections:


Miscellaneous/Other
Comment Only
10/09/2017
Electrical final and fire marshal final needed. 1) Install guard at ramp around electrical panel bank. 2) install railing at ramp. 3) correct spacing of sprinkler heads and diffusers in building space.

Fire Inspection Final Passed 10/10/2017 (8:00 - 10:00) 10/10/2017 10/10/2017
Building Final Inspection Passed 11/17/2017 (10:00 - 12:00) 11/17/2017 11/17/2017
Corrections:


Miscellaneous/Other
Comment Only
11/17/2017
All inspections completed, all work completed. Final approved