Permit Application Status

PRBD201703589


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201703589
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Remodel
Not Required
Retail tenant improvement, new storefront and interior build-out. Nespresso MOA.
05/11/2017
06/05/2017
11/16/2020
10/12/2017

Locations

Permits

Permit Number: PRBD201703589

Building
Finaled
06/05/2017
11/16/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Rough In Inspection Not Ready 6/23/2017 (10:00 - 12:00) 6/23/2017 06/23/2017
Corrections:


Miscellaneous/Other
Comment Only
06/23/2017
Not ready

Framing Inspection Partial Pass 7/3/2017 (10:00 - 12:00) 7/3/2017 07/03/2017
Corrections:


Miscellaneous/Other
Comment Only
07/03/2017
Wall framing approved. Fire stop electrical conduits through floor, leave one side open for reinspection.

Framing Inspection Partial Pass 7/12/2017 (10:00 - 12:00) 7/12/2017 07/12/2017
Corrections:


Miscellaneous/Other
Comment Only
07/12/2017
Partial approval for covering ceiling in sales area... small section left to frame out and be inspected.

Building Final Inspection Partial Pass 8/22/2017 (2:30 - 3:30) 8/22/2017 08/22/2017
Corrections:


Miscellaneous/Other
Comment Only
08/22/2017
Corrections:1) firecaulk data wire at passageway wall inside of space.2) lower bathroom mirror to max height of 40" from floor to reflective edge. 3) firestops to be inspected at through floor penetrations in passageway below space. 4) fix hand faucet hose at drawer to proved full opening of drawer behind sample counter. 5) Complete all final inspections prior to any temp or final occupancy. Approved to bring in fixtures and setup.

Fire Inspection Final Passed 9/1/2017 (10:00 - 12:00) 9/1/2017 09/01/2017
Building Final Inspection Passed 9/1/2017 (10:00 - 12:00) 9/1/2017 09/01/2017
Final - contingent upon clearing out exit passageway, and environmental health final.
Framing Inspection VOID 10/12/2017
Rough In Inspection VOID 10/12/2017