PRBD201703589
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Rough In Inspection | Not Ready | 6/23/2017 (10:00 - 12:00) | 6/23/2017 | 06/23/2017 |
Corrections:
Miscellaneous/Other
Comment Only
06/23/2017
Not ready
|
||||
Framing Inspection | Partial Pass | 7/3/2017 (10:00 - 12:00) | 7/3/2017 | 07/03/2017 |
Corrections:
Miscellaneous/Other
Comment Only
07/03/2017
Wall framing approved. Fire stop electrical conduits through floor, leave one side open for reinspection.
|
||||
Framing Inspection | Partial Pass | 7/12/2017 (10:00 - 12:00) | 7/12/2017 | 07/12/2017 |
Corrections:
Miscellaneous/Other
Comment Only
07/12/2017
Partial approval for covering ceiling in sales area... small section left to frame out and be inspected.
|
||||
Building Final Inspection | Partial Pass | 8/22/2017 (2:30 - 3:30) | 8/22/2017 | 08/22/2017 |
Corrections:
Miscellaneous/Other
Comment Only
08/22/2017
Corrections:1) firecaulk data wire at passageway wall inside of space.2) lower bathroom mirror to max height of 40" from floor to reflective edge. 3) firestops to be inspected at through floor penetrations in passageway below space. 4) fix hand faucet hose at drawer to proved full opening of drawer behind sample counter. 5) Complete all final inspections prior to any temp or final occupancy. Approved to bring in fixtures and setup.
|
||||
Fire Inspection Final | Passed | 9/1/2017 (10:00 - 12:00) | 9/1/2017 | 09/01/2017 |
Building Final Inspection | Passed | 9/1/2017 (10:00 - 12:00) | 9/1/2017 | 09/01/2017 |
Final - contingent upon clearing out exit passageway, and environmental health final. | ||||
Framing Inspection | VOID | 10/12/2017 | ||
Rough In Inspection | VOID | 10/12/2017 |