Summary

PRBD201703606
Building
Finaled
NORTH PAD DEVELOPMENT LLC
Alteration/Remodel
Assembly, restaurants, bars, banquet halls, nightclubs
Chick-Fil-A, 354 Central Avenue, MOA. Interior tenant improvement/expansion including architectural, mechanical, electrical and plumbing work in a previous restaurant fully sprinklered. (Separate EH permit approved PREH201702375)
05/11/2017
06/12/2017
04/29/2018
10/31/2017

Locations

Permits

Permit Number: PRBD201703606

Building
Finaled
06/12/2017
04/29/2018

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 7/3/2017 (10:00 - 12:00) 7/3/2017 07/03/2017
partial wall framing
Corrections:


Miscellaneous/Other
Comment Only
07/03/2017
Fire caulking at through piping penetrations in floor to be redone, leave open for inspection at the plumbing areas. Approved to cover walls at back of house, contractor to call for firestop inspections at plumbing areas.

Framing Inspection Partial Pass 07/05/2017
Corrections:


Miscellaneous/Other
Comment Only
07/05/2017
Talked with plumber and he will recaulk piping from the under side in the empty space below. Ok to cover walls at back of house including at the plumbing runs. Fire caulking to be reinspected at next inspection.

Framing Inspection Partial Pass 7/27/2017 (12:30 - 2:30) 7/27/2017 07/27/2017
Corrections:


Miscellaneous/Other
Comment Only
07/27/2017
Approved to cover front of buildout and back walls to mezzanine. Verbal to patch fireproofing in front.... send picture to inspector.

Above Ceiling Inspection Partial Pass 8/25/2017 (12:30 - 2:30) 8/25/2017 08/25/2017
Corrections:


Miscellaneous/Other
Comment Only
08/25/2017
Back of house above ceiling approved pending sprinkler approval.

Fire Inspection Final Not Ready 9/14/2017 (10:00 - 12:00) 9/14/2017 09/14/2017
Fire Inspection Final Partial Pass 09/14/2017
Corrections:


Miscellaneous/Other
Comment Only
09/14/2017
Partial final for stock, cooking, and training approved pending building and environmental health temp finals.

Building Final Inspection Partial Pass 9/15/2017 (12:30 - 2:30) 9/15/2017 09/15/2017
Corrections:


Miscellaneous/Other
Comment Only
09/15/2017
1) install smoke seal at rear door. 2) install floor transition at control joint in front of space. 3) clean space and complete misc work.4) E.H. List of corrections to be completed. 5) cabbage wash faucet to be operable. 6) fire final needed. All above items to be completed for final C.O. Approved at this point to stock and train only.

Fire Inspection Final Issue TCO 10/2/2017 (8:00 - 10:00) 10/2/2017 10/02/2017
Corrections:


Miscellaneous/Other
Resolved
10/03/2017
Rear corridor door needs to fully close and latch. Need to verify rating of rear door and its class look through.

Building Final Inspection Partial Pass 10/2/2017 (8:00 - 10:00) 10/2/2017 10/02/2017
Corrections:


Miscellaneous/Other
Comment Only
10/02/2017
Fire gave a 10 day temp with final to follow with correction and inspection. 1) rear door has a window installed that appears to be aftermarket. Contractor to verify if safety glazed and complies with mfg for the door rating. 2) handrail at ladder stair in rear back of house to be completely fastened and bolts tightened. 3) E.H. Corrections still are outstanding. 4) gas line at through passageway to be fire caulked. 5) equipment what was installed or came in after plan review of E.H. To be addressed and a splash guard is needed at the hand sink by lemonade table. As per fire temp to operate, the C.O.B will allow a 10 day temp to open and operate upon conditions of all corrections being completed and inspected. Temp C.O can be revoked and space closed if the issues are not addressed and inspections not followed up with.

Fire Inspection Final Passed 10/03/2017
Corrections:


Miscellaneous/Other
Outstanding
10/02/2017
Rear corridor door needs to fully close and latch. Need to verify rating of rear door and its class look through.

Building Final Inspection Passed 10/31/2017
Corrections:


Miscellaneous/Other
Comment Only
10/31/2017
All corrections completed. E.H. Sign off also approved by the inspector.