Permit Application Status

PRBD201704190


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201704190
Building
Finaled
BLMGTN SCHOOL DIST #271
Alteration/Remodel
Not Required
Secondary school renovations (Jefferson High School - Phase 1 only)
05/24/2017
06/16/2017
12/03/2019
08/31/2017

Locations

Permits

Permit Number: PRBD201704190

Building
Finaled
06/16/2017
12/03/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Passed 7/17/2017 (8:00 - 10:00) 7/17/2017 07/17/2017
Corrections:


Miscellaneous/Other
Comment Only
07/17/2017
Framing approved contingent on electrical ruffian approval. OK to cover soffits only.

Building Final Inspection Failed 8/25/2017 (8:00 - 10:00) 8/25/2017 08/25/2017
Corrections:


Miscellaneous/Other
Carried Forward
08/25/2017
Provide two exit signs as shown on city approved plans. Exit door to swing open in direction of exit travel and provide paddle hardware.

Fire Inspection Final Passed w/ Conditions 8/25/2017 (8:00 - 10:00) 8/25/2017 (AM) 08/25/2017
Phase I classroom remodel requires a minimum of 2 exits with appropriate signage and door hardware. 2 exit signs need to be added, one door needs appropriate panic hardware and the same door is required to swing out in the direction of travel.
Building Final Inspection Passed 8/31/2017 (Morning) 8/31/2017 08/31/2017
Corrections:


Miscellaneous/Other
Resolved
08/31/2017
Provide two exit signs as shown on city approved plans. Exit door to swing open in direction of exit travel and provide paddle hardware.

Miscellaneous/Other
Comment Only
08/31/2017
Existing door from special needs area to have door swing changed during phase 2 of construction in 2018 under separate permit.