Permit Application Status

PRBD201704195


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201704195
Building
Finaled
NORTH PAD DEVELOPMENT LLC
Alteration/Remodel
Not Required
Tenant buildout-office.
05/24/2017
06/28/2017
04/10/2018

Locations

Permits

Permit Number: PRBD201704195

Building
Finaled
06/28/2017
04/10/2018

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 8/7/2017 (12:30 - 2:30) 8/7/2017 08/07/2017
Corrections:


Miscellaneous/Other
Comment Only
08/07/2017
Wall framing approved to cover. Corrections at stair 2 hour wall and back of elevator shaft wall for 1st layer of gypsum to be inspected and putty pads added to 3 boxes. Patch fireproofing at center column. To be checked at reinspection to cover those ares.

Framing Inspection Partial Pass 8/15/2017 (8:00 - 10:00) 8/15/2017 08/15/2017
Corrections:


Miscellaneous/Other
Comment Only
08/15/2017
Putty pads added to electrical boxes at shaft wall.... approved to cover shaft walls. Hard lids approved to cover.

Above Ceiling Inspection Passed 9/14/2017 (2:30 - 3:30) 9/14/2017 09/14/2017
Corrections:


Miscellaneous/Other
Comment Only
09/14/2017
Approved to cover ceilings.

Fire Inspection Final Failed 9/14/2017 (10:00 - 12:00) 9/14/2017 09/14/2017
Corrections:


Miscellaneous/Other
Carried Forward
09/14/2017
Need to finish installing sprinkler head in wood cloud in conference room. Need to finish installing all furniture, fixture, equipment, flooring, etc. Need to test fire alarm system. Need all other trade inspection finals.

Progress Inspection Partial Pass 9/21/2017 (12:30 - 2:30) 9/21/2017 09/21/2017
Corrections:


Miscellaneous/Other
Comment Only
09/21/2017
Progress of work. Complete work and inspections for setup of occupancy inspection on 9/22.

Fire Inspection Final Passed 9/22/2017 (10:00 - 12:00) 9/22/2017 09/22/2017
Corrections:


Miscellaneous/Other
Outstanding
09/14/2017
Need to finish installing sprinkler head in wood cloud in conference room. Need to finish installing all furniture, fixture, equipment, flooring, etc. Need to test fire alarm system. Need all other trade inspection finals.

Building Final Inspection Partial Pass 9/22/2017 (10:00 - 12:00) 9/22/2017 09/22/2017
Corrections:


Miscellaneous/Other
Comment Only
09/22/2017
Approved for temp occupancy for staff to come in and work this weekend under these conditions... 1) contractor to clean up and remove tools/carts. 2) tempered glass for doors to be installed for full occupancy. 3) patching to be done at kitchenette outlets and outlets to be fully installed by the end of day. 4) instant hot heater wiring to be terminated in a junction box till unit arrives and is installed. Call for full final inspection when all the remaining work is complete.

Building Final Inspection Passed 10/12/2017 (8:00 - 10:00) 10/12/2017 10/12/2017
Corrections:


Miscellaneous/Other
Comment Only
10/12/2017
All work and inspections completed. Final approved for occupancy.