PRBD201704401
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Framing Inspection | Partial Pass | 7/5/2017 (10:00 - 12:00) | 7/5/2017 | 07/05/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
07/05/2017
Storefront framing, walls, and one framed up column. ...ok to cover. Floor holes approved to fill with concrete.
|
||||
| Framing Inspection | Partial Pass | 7/7/2017 (8:00 - 10:00) | 7/7/2017 | 07/07/2017 |
| Above ceiling | ||||
|
Corrections:
Miscellaneous/Other
Comment Only
07/07/2017
Verbal correction to add framing member on each wall of column wrap, also to fireproof patch to stud attachment to column. Ok to cover columns.
|
||||
| Framing Inspection | Passed | 7/19/2017 (12:30 - 2:30) | 7/19/2017 | 07/19/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
07/19/2017
Approved to cover ceilings in Black light golf space.
|
||||
| Fire Inspection Final | Failed | 8/9/2017 (8:00 - 10:00) | 8/9/2017 (AM) | 08/09/2017 |
| Back exit door is not contrasting to the back ground. Contractor and MOA working on a solution. Current plan is to leave the door black and paint the frame/components fluorescent green. Contractor will advise on final plan and schedule inspection for verification. | ||||
| Building Final Inspection | Failed | 8/9/2017 (8:00 - 10:00) | 8/9/2017 | 08/09/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
08/09/2017
rear door to be contrasting color and shut and latch. Install transition to rear door carpet. Relocate curb stone out of egress path to rear exit. Electrical final needed, pending inspection scheduled today. No public opening at this time.
|
||||
| Fire Inspection Final | Passed | 8/9/2017 | 08/09/2017 | |
| Back exit door painted and is acceptable. | ||||
| Building Final Inspection | Partial Pass | 08/09/2017 | ||
|
Corrections:
Miscellaneous/Other
Comment Only
08/09/2017
Electrical final needed and recheck by fire. All have approved a temp for opening to public with a reinspection for final within 7 days.
|
||||
| Building Final Inspection | Passed | 8/17/2017 (10:00 - 12:00) | 8/17/2017 | 08/17/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
08/17/2017
Final approved for occupancy
|
||||