Permit Application Status

PRBD201707048


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201707048
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Remodel
Not Required
MOA tenant improvement. Dough Dough.
08/02/2017
08/30/2017
10/20/2018
04/23/2018

Locations

Permits

Permit Number: PRBD201707048

Building
Finaled
08/30/2017
10/20/2018

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 9/11/2017 (12:30 - 2:30) 9/11/2017 09/11/2017
Partial framing, see corrections.
Corrections:


Miscellaneous/Other
Outstanding
09/11/2017
Framing - A. Need front smoke wall ceiling framing to support storefront bulkhead completed. Need more firecaulking at new thru floor plastic 2 inch plumbing penetrations completed. Approved. B. Call for above ceiling for all trade inspections, fire sprinkler, HVAC, electrical, and plumbing rough in for New mop sink and\ store cabinet island vent and waste not installed] at this time.

Framing Inspection Passed w/ Conditions 9/18/2017 (12:30 - 2:30) 9/18/2017 09/18/2017
Corrections:


Miscellaneous/Other
Comment Only
09/18/2017
Approved to cover hard lids and drop panels in ceiling grids pending approval of sprinkler inspection.

Framing Inspection Passed 10/13/2017 (10:00 - 12:00) 10/13/2017 10/13/2017
Corrections:


Miscellaneous/Other
Comment Only
10/13/2017
Above ceiling approved pending sprinkler inspection.

Fire Inspection Final Passed w/ Conditions 10/23/2017 (12:30 - 2:30) 10/23/2017 10/23/2017
Corrections:


Miscellaneous/Other
Comment Only
10/23/2017
Fire Final Approved pending Building and Environmental Health Final Inspections

Building Final Inspection Failed 10/23/2017 (12:30 - 2:30) 10/23/2017 10/23/2017
Corrections:


Miscellaneous/Other
Comment Only
10/23/2017
1) space to be thoroughly cleaned. 2) install sprinkler escutcheon 3) corrections for E.H. To be completed. All items to be completed for final C.O. Approved to stock and train. No final C.O. At this time.

Building Final Inspection Partial Pass 10/27/2017 (8:00 - 10:00) 10/27/2017 10/27/2017
Corrections:


Miscellaneous/Other
Comment Only
10/27/2017
Approved to open to public. 1) oven to have a type 2 hood , Hvac permit , electrical permit and inspections needed. No use of oven at this time. Approval given to open per E.H. And fire inspection.

Building Final Inspection Passed 04/23/2018
Corrections:


Miscellaneous/Other
Comment Only
04/23/2018
The equipment that needed a hood was removed, there is nothing outstanding with this permit anymore. Final approved.