PRBD201707178
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Passed w/ Conditions | 04/18/2018 | ||
Corrections:
Miscellaneous/Other
Outstanding
04/18/2018
Framing - A. Premanufactured large clean room. B. Premanufactured ceiling hung by strut from building ceiling supporting structure. C. Pedestal footing supports for premanufactured floor frame. D. Premanufactured wall panels then inserted between floor and ceiling. E. Follow engineering or construction documents to confirm if screw fastening requirements are required for approx. 500 footing pedestals, approx. 36 inches in vertical length. Confirm if footing pedestals need mechanical fastening to concrete floor. Note contractor glued footing pedestals to concrete using PL 400 construction adhesive. E. Need sprinkler permit and inspection for interior ceiling heads. D. Need electrical rough in - final inspection approval.
E. Using clean room at this time.
|
||||
Fire Inspection Final | Passed w/ Conditions | 4/2/2019 (8:00 - 10:00) | 4/2/2019 (AM) | 04/02/2019 |
Corrections:
Miscellaneous/Other
Comment Only
04/02/2019
Approved pending Building Inspection approval. Ensure sprinkler permits related to job are finaled.
|
||||
Building Final Inspection | Passed | 4/2/2019 (8:00 - 10:00) | 4/2/2019 (AM) | 04/02/2019 |
Corrections:
Miscellaneous/Other
Comment Only
04/02/2019
Final approved
|