Permit Application Status

PRBD201707178


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201707178
Building
Finaled
Nick Mauk
Alteration/Remodel
Not Required
Clean room addition, Polarfab 3.
08/07/2017
09/15/2017
09/29/2019
04/02/2019

Locations

Permits

Permit Number: PRBD201707178

Building
Finaled
09/15/2017
09/29/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Passed w/ Conditions 04/18/2018
Corrections:


Miscellaneous/Other
Outstanding
04/18/2018
Framing - A. Premanufactured large clean room. B. Premanufactured ceiling hung by strut from building ceiling supporting structure. C. Pedestal footing supports for premanufactured floor frame. D. Premanufactured wall panels then inserted between floor and ceiling. E. Follow engineering or construction documents to confirm if screw fastening requirements are required for approx. 500 footing pedestals, approx. 36 inches in vertical length. Confirm if footing pedestals need mechanical fastening to concrete floor. Note contractor glued footing pedestals to concrete using PL 400 construction adhesive. E. Need sprinkler permit and inspection for interior ceiling heads. D. Need electrical rough in - final inspection approval. E. Using clean room at this time.

Fire Inspection Final Passed w/ Conditions 4/2/2019 (8:00 - 10:00) 4/2/2019 (AM) 04/02/2019
Corrections:


Miscellaneous/Other
Comment Only
04/02/2019
Approved pending Building Inspection approval. Ensure sprinkler permits related to job are finaled.

Building Final Inspection Passed 4/2/2019 (8:00 - 10:00) 4/2/2019 (AM) 04/02/2019
Corrections:


Miscellaneous/Other
Comment Only
04/02/2019
Final approved