Permit Application Status

PRBD201707837


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201707837
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Remodel
Mercantile
Interior alterations - Lush @ MOA.
08/23/2017
09/19/2017
07/17/2019
01/18/2019

Locations

Permits

Permit Number: PRBD201707837

Building
Finaled
09/19/2017
07/17/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 10/17/2017 (10:00 - 12:00) 10/17/2017 10/17/2017
Corrections:


Miscellaneous/Other
Comment Only
10/17/2017
Approved to cover walls only. 1) correct framing at storefront, install box beam header and supporting posts for the framing. No framing can be supported off the mall bulkhead. Reinspection required.

Framing Inspection Partial Pass 10/19/2017 (10:00 - 12:00) 10/19/2017 10/19/2017
Corrections:


Miscellaneous/Other
Comment Only
10/19/2017
Framing at transformer platform and storefront approved

Framing Inspection Partial Pass 10/30/2017
Corrections:


Miscellaneous/Other
Comment Only
10/30/2017
Above ceiling and ceiling framing approved. Covering of the main area hard lid is pending sprinkler inspection, fire inspector to give final approval to cover when inspected at the area demarcation of the diffuser where heads are not mounted. Remain ceiling has been approved to cover. Exhaust duct needs to be designed by engineer and approved by MOA and City of Bloomington plan review for its location and design so as not to impede on the width requirement as it passes through the floors with a protecting barrier around it.

Building Final Inspection Partial Pass 12/1/2017 (12:30 - 2:30) 12/1/2017 12/01/2017
Corrections:


Miscellaneous/Other
Outstanding
12/01/2017
1)Exit signage needed to direct from the front near cashwrap to the rear exit. 2) lower one sink in the retail area to comply with accessibility height of sinks,(34”). HVAC permit and inspections to be completed. Fireproofing to beam behind the duct in passageway to be patched on the 1st and 2nd level. Protective surrounds to be installed around duct to height of 8ft. Per mall requirements. Approved to stock and train, not to open yet.

Fire Inspection Final Partial Pass 12/1/2017 (12:30 - 2:30) 12/1/2017 12/01/2017
Corrections:


Miscellaneous/Other
Outstanding
12/01/2017
Install exit sign as discussed.

Building Final Inspection Partial Pass 12/7/2017 (8:00 - 10:00) 12/7/2017 12/07/2017
Corrections:


Miscellaneous/Other
Outstanding
12/07/2017
1) Complete fireproofing patching to 3rd floor beam next to the duct. 2) fire collars at floors and at rated roof to be compliant with the rating of each, 20 gage is incorrect. 3) complete the protective surround around the ducts at each level, the steel surround is to be installed at 3rd level when it comes in. HVAC FINAL NEEDED. Reinspection is required. See comment for temp final.

Miscellaneous/Other
Comment Only
12/07/2017
Temp for opening is approved pending approval by HVAC inspector. Reinspection required, 15 day temp to complete these items.

Fire Inspection Final Passed 12/7/2017 (8:00 - 10:00) 12/7/2017 (AM) 12/07/2017
Building Final Inspection Passed 12/18/2017 (10:00 - 12:00) 12/18/2017 01/18/2019
Corrections:


Miscellaneous/Other
Comment Only
12/18/2017
Fire collars installed as required to all locations. (16 gage).... final approved pending the close out of HVAC permit.