Permit Application Status

PRBD201708330


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201708330
Building
Finaled
NORTH PAD DEVELOPMENT LLC
Alteration/Remodel
Not Required
Relocate 1st and 2nd floor restrooms for incoming tenant.
09/07/2017
10/09/2017
08/15/2018
02/16/2018

Locations

Permits

Permit Number: PRBD201708330

Building
Finaled
10/09/2017
08/15/2018

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 10/13/2017 (12:30 - 2:30) 10/13/2017 10/13/2017
Corrections:


Miscellaneous/Other
Comment Only
10/13/2017
2nd floor framing of walls and ceilings approved to cover Penang electrical inspection and verification of sprinkler inspection approval.

Framing Inspection Partial Pass 11/07/2017
Corrections:


Miscellaneous/Other
Comment Only
11/07/2017
2nd floor... 2 more wall sections of shaft wall framing at the stair relocation is approved to cover. Assembly will have1 layer of gypsum on each side of the shaft wall to make up the 2 hour assembly. 1st floor furred wall framing at cooridor to bathrooms approved.

Framing Inspection Passed w/ Conditions 11/17/2017 (8:00 - 10:00) 11/17/2017 11/17/2017
Corrections:


Miscellaneous/Other
Comment Only
11/17/2017
Approved to cover walls and ceilings on 1st level. Hole in floor to be filled with concrete. Provide picture for inspection.

Framing Inspection Partial Pass 11/30/2017 (12:30 - 2:30) 11/30/2017 11/30/2017
Corrections:


Miscellaneous/Other
Comment Only
11/30/2017
Shaft wall framing at stair approved to cover, provide pictures of fire caulking at upper platform wall through wall wiring, and electrical box to have 2hour putty pad. Ceiling also approved at 1st level. Note: fireproofing to be inspected, call for that inspection.

Building Final Inspection Partial Pass 1/18/2018 (10:00 - 12:00) 1/18/2018 01/18/2018
Corrections:


Miscellaneous/Other
Comment Only
01/18/2018
2nd floor bathrooms on north side approved, pending fire inspection approval. Ok to have open for Super Bowl occupant use.

Fire Inspection Final Passed 2/16/2018 (7:00 - 8:00) 2/16/2018 02/16/2018
Building Final Inspection Passed 2/16/2018 (8:00 - 10:00) 2/16/2018 02/16/2018
Corrections:


Miscellaneous/Other
Comment Only
02/16/2018
Final approved. Ok to open for public use.