PRBD201709399
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Framing Inspection | Partial Pass | 10/31/2017 (10:00 - 12:00) | 10/31/2017 | 10/31/2017 |
|
Corrections:
Miscellaneous/Other
Outstanding
10/31/2017
Framing 3rd floor; A. Walls to ceiling tile grid, ok. B. Patch 1 spot fireproofing bottom of beam. C. Firecaulking inspection, for floor penetrations for new framed walls, required. (Pending ). D. Call for above ceiling inspections for subcontractors for ...electrical, low voltage wiring, HVAC, and fire sprinkler.
|
||||
| Fire Rating Inspection | Passed | 11/1/2017 (7:00 - 8:00) | 11/1/2017 | 11/01/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
11/01/2017
Firecaulking floor penetrations for electrical wiring. - 2 hr.
|
||||
| Fire Inspection Final | Passed | 12/19/2017 (12:30 - 2:30) | 12/19/2017 | 12/19/2017 |
| Framing Inspection | Passed | 12/19/2017 | ||
| Fireproofing - at bottom of main I-beam. - work completed by hand patch product. | ||||
| Building Final Inspection | Passed | 12/19/2017 (12:30 - 2:30) | 12/19/2017 | 12/19/2017 |