Permit Application Status

PRBD201709686


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201709686
Building
Finaled
Jim Lonto, Greiner Construction
Alteration/Repair/Replace
Assembly, restaurants, bars, banquet halls, nightclubs
Interior ADA upgrades to customer service and restrooms. Remodel of Exterior finish and re-branding.
10/10/2017
02/06/2019
01/20/2020
02/06/2019

Locations

Permits

Permit Number: PRBD201709686

Building
Finaled

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Progress Inspection Pending
Exterior masonry: Extending north end of building exterior masonry parapet wall and cap. Approved - no required inspections. A. Access to the roof top from the interior must be provided for, due to the completed increased height of the north end of the buildings exterior parapet wall as measured from the exterior roof membrane.
Above Ceiling Inspection Partial Pass 04/18/2019
All Common public area, not kitchen. Partial pass, need fire sprinkler rough in,
Building Final Inspection Not Ready 4/19/2019 (12:30 - 2:30) 4/19/2019 (PM) 04/19/2019
Corrections:


Miscellaneous/Other
Carried Forward
04/19/2019
Partial final - interior only. A. Need fire marshal final, environmental health final, interior electrical partial final, interior plumbing partial final, and then building interior partial final. B. Building inspections requires the drive up must then be closed when the interior is open, due to all remaining exterior construction work including ...lift machinery, ladders, roof wall work, exterior cladding and coating, around the mouth, west, and south drive up lane. C. Two of the three exit doors in the restaurant seating area, and all exit signage w/ emergency lighting must be functioning.

Building Final Inspection Partial Pass 04/22/2019
Interior final only for accessibility heights and clearances and exterior accessible parking - 2 stalls. (Partial approved.) A. Corrections interior: 1. Need to add 1 sprinkler head and need fire final. 2. Need electric final, plumbing final, and HVAC final, fire final, and emergency exit lighting. 3. Environmental health is final - approved.
Corrections:


Miscellaneous/Other
Outstanding
04/19/2019
Partial final - interior only. A. Need fire marshal final, environmental health final, interior electrical partial final, interior plumbing partial final, and then building interior partial final.

Miscellaneous/Other
Outstanding
04/22/2019
PARTIAL FINAL INTERIOR ONLY: A. Environmental final - approved. B. Fire sprinkler - need added head, and final testing. C. Building interior accessibility with 2 exterior accessible parking - approved. D. Exit signage installed, but need interior emergency lighting throughout all interior of building, kitchen, exterior storage, and restrooms ?

Progress Inspection Passed 04/26/2019
Exterior stucco- framing 24 inch on center, 3/4 plywood sheeting. A. lowest elevation bent metal flashing, grade 60 paper, diamond mesh, lath, galvanized 3/8 inch head screw fasteners, vertical expansion joint, non continuous mesh at vertical expansion joints. - approved.
Framing Inspection Passed 04/26/2019
Exterior framing- installing sheeting by 3/4 inch plywood for 60 MIN grade D paper, metal diamond mesh, vertical expansion joint-non continuous mesh, bottom weep screed, galvanized 3/8 inch head diameter minimum. Inspection tomorrow 4/26/19. Contractor on site today.
Framing Inspection Passed 04/26/2019
Exterior building parapet.
Framing Inspection Passed 04/26/2019
South end parapet framing progress. Note, call for reinspection when complete prior to covering. Greiner Construction on site.
Progress Inspection Passed 04/26/2019
Site visit - progress, interior dust control. Food contimanitation concerns.
Progress Inspection Passed 04/26/2019
Provide dust and debree control between existing kitchen that is cooking and selling food thru drive, from existing construction. A. Complaint filed with customer to State of MN, and State notified City of Bloomington. B. Today on site, dust control by poly curtain. B. All staff should enter leave through premises, through one back shop east side entrance.
Framing Inspection Passed 4/9/2019 (8:00 - 10:00) 4/9/2019 (AM) 04/26/2019
Interior wall framing per plan. Call for roof framing, and parapet framing when ready. May need seperate sign permit from city planning and make sure all (McDonald’s electrical signs are UL LISTED.)
Corrections:


Miscellaneous/Other
Outstanding
04/09/2019
Interior wall framing - approved. A. Call for all framing of exterior roof parapets, and south roof revision having additional wood framing on top of existing roof structure. B. Verify with Mcdonalds owner delegating scope of work for existing south exterior sidewalk entry, as accessibility is not required for this entry, and as it is located in the existing drive up lane...-but it can still be used as an emergency exit.

Lath Inspection Passed 04/26/2019
Exterior stucco and tile: ALL on approved framing, sheeting, paper, lath, expansion, fasteners,bead stop, weep bead stop.
Fire Inspection Final Passed 4/19/2019 (12:30 - 2:30) 4/19/2019 (PM) 05/03/2019
Above Ceiling Inspection Passed 05/13/2019
Above ceiling interior inspections completed to date. A. Finals have been issued for fire sprinkler, HVAC, environmental health, and partial final for interior walls except exterior building signage wiring. B. Building inspection above ceiling is completed.
Framing Inspection Passed 05/13/2019
Balance of framing for minor terminations of tile work, and veneer work over existing building exterior brick masonry.
Building Final Inspection Not Ready 06/10/2019
Final building remodel requires : A. Final ALL open permits: NOTE: There are 3 open electrical permits, 1 open sign permit, 1 open plumbing permit, that require (final inspection approval) prior to building final. B. See all conditions to be satisfied, in computer prior to final building inspection.
Building Final Inspection Passed 7/22/2019 (10:00 - 12:00) 7/22/2019 (AM) 07/24/2019
All planning issues have been satisfied.
Sign Removal Verification VOID 01/31/2020
Exrerior Sign permit required. All must be UL LISTED electrical signage .