PRBD201709762
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Fire Inspection Final | Pending | |||
Building Final Inspection | Pending | |||
Framing Inspection | Partial Pass | 4/25/2018 (8:00 - 10:00) | 4/25/2018 | 04/25/2018 |
Corrections:
Miscellaneous/Other
Comment Only
04/25/2018
Framing approved at both bathrooms on 4th floor.
Fireproofing needs to be patched where the structural beams are exposed and fireproofing is missing. Will recheck this at next inspection of this bathroom group.
|
||||
Framing Inspection | Partial Pass | 5/1/2018 (2:30 - 3:30) | 5/1/2018 | 05/01/2018 |
Corrections:
Miscellaneous/Other
Comment Only
05/01/2018
Bathrooms on 6th floor ... framing and all backing approved.
|
||||
Miscellaneous/Other
Outstanding
05/01/2018
1) patch fireproofing at beam in 2 locations, reinspection at above ceiling inspection required.
|
||||
Framing Inspection | Partial Pass | 5/8/2018 (8:00 - 10:00) | 5/8/2018 | 05/08/2018 |
Corrections:
Miscellaneous/Other
Outstanding
05/08/2018
Correct fireproofing at beam.check at above ceiling inspection.
|
||||
Miscellaneous/Other
Comment Only
05/08/2018
7th floor bathrooms framing approved.
|
||||
Framing Inspection | Partial Pass | 5/10/2018 (12:30 - 2:30) | 5/10/2018 | 05/10/2018 |
Corrections:
Miscellaneous/Other
Comment Only
05/10/2018
10th floor framing approved to cover.
|
||||
Miscellaneous/Other
Outstanding
05/10/2018
Correct firproofing at beam. Reinspection needed with above ceiling insp.
Bathrooms on 13th floor need firestops at 3 piping locations, obtain assembly and call for reinspection.
|
||||
Framing Inspection | Partial Pass | 5/14/2018 (10:00 - 12:00) | 5/14/2018 | 05/14/2018 |
Corrections:
Miscellaneous/Other
Comment Only
05/14/2018
Through floor piping in bathrooms of 13th floor are wrapped to allow floor deflection and contractor installed metal plate at bottom of hole with concrete filling the annular enlarged space around piping. The use of a 3 hour fire caulking is sealing around the annular space of the piping. Approved to now cover walls.
|
||||
Framing Inspection | Partial Pass | 6/7/2018 (8:00 - 10:00) | 6/7/2018 | 06/07/2018 |
Corrections:
Miscellaneous/Other
Comment Only
06/07/2018
Fireproofing on floors 4, 6,7,10,13 approved and ok to cover.
|
||||
Building Final Inspection | Not Ready | 6/12/2018 (12:30 - 2:30) | 6/12/2018 | 06/12/2018 |
Corrections:
Miscellaneous/Other
Comment Only
06/12/2018
Floors 4 & 6 , complete tile patching, trap coverings, and signage at doors. Reinspection needed.
|
||||
Building Final Inspection | Partial Pass | 6/13/2018 (12:30 - 2:30) | 6/13/2018 | 06/13/2018 |
Corrections:
Miscellaneous/Other
Outstanding
06/13/2018
4 & 6th floor woman’s bathroom to be viewed again for the guard cover at sinks. Trap wraps are installed, but they don’t cover the full piping extensions.
|
||||
Miscellaneous/Other
Comment Only
06/13/2018
4th & 6th floor bathrooms are approved to open for public use. See “outstanding “ comment for correction that can be viewed at next inspection.
|
||||
Building Final Inspection | Partial Pass | 7/26/2018 (8:00 - 10:00) | 7/26/2018 | 07/26/2018 |
Corrections:
Miscellaneous/Other
Comment Only
07/26/2018
7th, 10th, 13th floor bathrooms....install signage and cover screen at sink. All other ada requirements approved with these rooms at these floors.
Call for reinspection
|