Permit Application Status

PRBD201709762


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201709762
Building
Closed
PWA RIVERVIEW OFC TWR LP
Alteration/Remodel
Not Required
Restroom improvements - multiple floors (1, 4, 6, 7, 10, 13 and 15)
10/11/2017
03/28/2018
01/22/2019

Locations

Permits

Permit Number: PRBD201709762

Building
Closed
03/28/2018
01/22/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Fire Inspection Final Pending
Building Final Inspection Pending
Framing Inspection Partial Pass 4/25/2018 (8:00 - 10:00) 4/25/2018 04/25/2018
Corrections:


Miscellaneous/Other
Comment Only
04/25/2018
Framing approved at both bathrooms on 4th floor. Fireproofing needs to be patched where the structural beams are exposed and fireproofing is missing. Will recheck this at next inspection of this bathroom group.

Framing Inspection Partial Pass 5/1/2018 (2:30 - 3:30) 5/1/2018 05/01/2018
Corrections:


Miscellaneous/Other
Comment Only
05/01/2018
Bathrooms on 6th floor ... framing and all backing approved.

Miscellaneous/Other
Outstanding
05/01/2018
1) patch fireproofing at beam in 2 locations, reinspection at above ceiling inspection required.

Framing Inspection Partial Pass 5/8/2018 (8:00 - 10:00) 5/8/2018 05/08/2018
Corrections:


Miscellaneous/Other
Outstanding
05/08/2018
Correct fireproofing at beam.check at above ceiling inspection.

Miscellaneous/Other
Comment Only
05/08/2018
7th floor bathrooms framing approved.

Framing Inspection Partial Pass 5/10/2018 (12:30 - 2:30) 5/10/2018 05/10/2018
Corrections:


Miscellaneous/Other
Comment Only
05/10/2018
10th floor framing approved to cover.

Miscellaneous/Other
Outstanding
05/10/2018
Correct firproofing at beam. Reinspection needed with above ceiling insp. Bathrooms on 13th floor need firestops at 3 piping locations, obtain assembly and call for reinspection.

Framing Inspection Partial Pass 5/14/2018 (10:00 - 12:00) 5/14/2018 05/14/2018
Corrections:


Miscellaneous/Other
Comment Only
05/14/2018
Through floor piping in bathrooms of 13th floor are wrapped to allow floor deflection and contractor installed metal plate at bottom of hole with concrete filling the annular enlarged space around piping. The use of a 3 hour fire caulking is sealing around the annular space of the piping. Approved to now cover walls.

Framing Inspection Partial Pass 6/7/2018 (8:00 - 10:00) 6/7/2018 06/07/2018
Corrections:


Miscellaneous/Other
Comment Only
06/07/2018
Fireproofing on floors 4, 6,7,10,13 approved and ok to cover.

Building Final Inspection Not Ready 6/12/2018 (12:30 - 2:30) 6/12/2018 06/12/2018
Corrections:


Miscellaneous/Other
Comment Only
06/12/2018
Floors 4 & 6 , complete tile patching, trap coverings, and signage at doors. Reinspection needed.

Building Final Inspection Partial Pass 6/13/2018 (12:30 - 2:30) 6/13/2018 06/13/2018
Corrections:


Miscellaneous/Other
Outstanding
06/13/2018
4 & 6th floor woman’s bathroom to be viewed again for the guard cover at sinks. Trap wraps are installed, but they don’t cover the full piping extensions.

Miscellaneous/Other
Comment Only
06/13/2018
4th & 6th floor bathrooms are approved to open for public use. See “outstanding “ comment for correction that can be viewed at next inspection.

Building Final Inspection Partial Pass 7/26/2018 (8:00 - 10:00) 7/26/2018 07/26/2018
Corrections:


Miscellaneous/Other
Comment Only
07/26/2018
7th, 10th, 13th floor bathrooms....install signage and cover screen at sink. All other ada requirements approved with these rooms at these floors. Call for reinspection