PRBD201711045
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Passed | 12/4/2017 (10:00 - 12:00) | 12/4/2017 | 12/04/2017 |
Corrections:
Miscellaneous/Other
Comment Only
12/04/2017
framing approved.
|
||||
Building Final Inspection | Failed | 12/14/2017 (10:00 - 12:00) | 12/14/2017 | 12/14/2017 |
Corrections:
Miscellaneous/Other
Carried Forward
12/14/2017
1) install occupancy load signage on wall inside game space by entry door. 2) install directional exit sign hanging from unistrut pointing toward the double doors exit. 3) Sprinkler heads to be installed at the two fixed structures with roofs. Follow up with fire inspector with this correction.
EM lighting approved.
Temp occupancy not allowed as yet.
|
||||
Fire Inspection Final | Failed | 12/14/2017 (10:00 - 12:00) | 12/14/2017 (AM) | 12/14/2017 |
Fire Inspection Final | Partial Pass | 12/15/2017 (10:00 - 12:00) | 12/15/2017 | 12/15/2017 |
Corrections:
Miscellaneous/Other
Outstanding
12/15/2017
Partial Final Approved for 30 Days Only.
Need to inspection roofs/sprinkler protection of display roofs in laser tag area once installed
|
||||
Building Final Inspection | Partial Pass | 12/15/2017 (10:00 - 12:00) | 12/15/2017 | 12/15/2017 |
Corrections:
Miscellaneous/Other
Resolved
12/15/2017
1) install occupancy load signage on wall inside game space by entry door. 2) install directional exit sign hanging from unistrut pointing toward the double doors exit. 3) Sprinkler heads to be installed at the two fixed structures with roofs. Follow up with fire inspector with this correction.
EM lighting approved.
Temp occupancy not allowed as yet.
|
||||
Miscellaneous/Other
Outstanding
12/15/2017
Occupancy sign installed and directional exit installed. The roofs were removed from the theming so they can open under the installed sprinkler coverage. Roofs will be reinstalled when the sprinklers are also installed to provide coverage for the 2 locations. Approved for temp occupancy of 30 days to complete that scope of sprinkler work and get inspections.
|
||||
Building Final Inspection | Passed | 12/20/2017 (10:00 - 12:00) | 12/20/2017 | 12/20/2017 |
Corrections:
Miscellaneous/Other
Comment Only
12/20/2017
All corrections are completed, final approved for this scope of permit work. Fire final is pending , if not already completed.
|
||||
Fire Inspection Final | Passed | 04/20/2018 |