PRBD201711146
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Framing Inspection | Partial Pass | 12/26/2017 (8:00 - 10:00) | 12/26/2017 | 12/26/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
12/26/2017
Framing - A. Patch fireproofing above ceiling in areas of scope of work. B. Interior framing - ok to proceed. C. Need to verify 1 hour rated corridor for one tenant occupying same floor with city plan review. D. Call for above ceiling for all trades, electrical, low voltage, patch fire proofing, walls rated to deck, fire sprinkler.
|
||||
| Progress Inspection | Partial Pass | 1/2/2018 (10:00 - 12:00) | 1/2/2018 | 01/02/2018 |
| Above ceiling - 1 hr cooridor. A. Review of one hour cooridor walls to fluted steel decking, min 24 - 26 guage round duct passing thru one hour corridor ceiling - approved. B. 20 minute doors with closers required. C. Patch existing steel beam fireproofing using Cafco brand hand patch. D. Existing elevator lobby doors with closers for smoke resistant construction per plan. Verify gypsum bulkhead wall to deck above existing elevator lobby smoke resistant doors. Fire caulk and tape seams of gypsum one hour walls to deck. | ||||
| Progress Inspection | Passed | 3/1/2018 (8:00 - 10:00) | 3/1/2018 | 03/01/2018 |
| Framing Inspection | Passed | 03/01/2018 | ||
| Building Final Inspection | Passed | 03/01/2018 | ||