PRBD201711234
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Passed w/ Conditions | 1/12/2018 (10:00 - 12:00) | 1/12/2018 | 01/12/2018 |
Corrections:
Miscellaneous/Other
Comment Only
01/12/2018
Framing approved in walls and ceiling.
Contractor to add wires to support at the cold rolled within ceiling framing to support the ceiling framing. Repair the rated wall at rear of space next to the damper and the 4 holes to the side of damper... wall is 1 hour rated and needs to be compliant to rating. Can be checked at next inspection.
|
||||
Walk-through Inspection | Passed | 1/24/2018 (8:00 - 10:00) | 1/24/2018 | 01/24/2018 |
Walk through/progress inspection - trades haven't been finaled yet. ajacobson 01/22/2018 2:31 PM | ||||
Corrections:
Miscellaneous/Other
Comment Only
01/24/2018
Above ceiling, Approved. Ok to pad out.
|
||||
Fire Inspection Final | Passed w/ Conditions | 01/26/2018 | ||
Corrections:
Fire extinguisher(s) needed.
Comment Only
01/26/2018
Fire extinguisher(s) needed prior to opening store.
|
||||
Building Final Inspection | Passed w/ Conditions | 1/29/2018 (8:00 - 10:00) | 1/29/2018 | 01/29/2018 |
Corrections:
Miscellaneous/Other
Comment Only
01/29/2018
Final approved pending the inspection by Environmental Health.
|