PRBD201711744
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Framing Inspection | Not Ready | 4/11/2018 (10:00 - 12:00) | 4/11/2018 | 04/11/2018 |
|
Corrections:
Miscellaneous/Other
Carried Forward
04/11/2018
Engineer to access the dividing wall between bathroom groups for deflection since wall is built under and attached to the truss. Wall is of light gage metal framing. The support rods and conduits are for support of the dimising wallbetween bathroom and prayer room, these supports to be more permanently fastened and kickers added to wall for support.
Electrical and mechanical inspections needed prior to the framing inspection.
|
||||
| Framing Inspection | Passed w/ Conditions | 5/25/2018 (8:00 - 10:00) | 5/25/2018 | 05/25/2018 |
|
Corrections:
Miscellaneous/Other
Resolved
05/25/2018
Engineer to access the dividing wall between bathroom groups for deflection since wall is built under and attached to the truss. Wall is of light gage metal framing. The support rods and conduits are for support of the dimising wallbetween bathroom and prayer room, these supports to be more permanently fastened and kickers added to wall for support.
Electrical and mechanical inspections needed prior to the framing inspection.
|
||||
|
Miscellaneous/Other
Comment Only
05/25/2018
Framing approved and ok to cover.
Remove the 2x4 studs used for piping support and replace wit metal studs, ( located in ceiling).
Approved to complete the closet walls. Provide pictures for inspector.
|
||||