Summary

PRBD201801906
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Remodel
Not Required
Remodel of an existing food service space to a new food service space.
03/07/2018
04/16/2018
12/15/2018
06/18/2018

Locations

Permits

Permit Number: PRBD201801906

Building
Finaled
04/16/2018
12/15/2018

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Passed w/ Conditions 5/1/2018 (12:30 - 2:30) 5/1/2018 05/01/2018
Corrections:


Miscellaneous/Other
Comment Only
05/01/2018
Storefront framing approved.

Miscellaneous/Other
Outstanding
05/01/2018
Remove wood that was added to the knee wall storefront. Provide pictures of it removed and the metal backing installed.

Above Ceiling Inspection Passed 5/24/2018 (12:30 - 2:30) 5/24/2018 05/24/2018
Corrections:


Miscellaneous/Other
Comment Only
05/24/2018
Above ceiling approved. Ok to cover.

Building Final Inspection Not Ready 6/7/2018 (10:00 - 12:00) 6/7/2018 06/07/2018
Corrections:


Miscellaneous/Other
Comment Only
06/07/2018
This was a pre-inspection, work to be completed and inspections to be approved and finaled by trades inspectors. Testing of the hoods and suppression system to also be done. E.H. To do final inspection with building final.

Building Final Inspection Failed 6/8/2018 (12:30 - 2:30) 6/8/2018 06/08/2018
Corrections:


Miscellaneous/Other
Carried Forward
06/08/2018
Fire suppression to be addressed and approved. Cleaning of space needed. Install appliances. E.H. To also inspect and approve space. All trade inspections to be finaled.

Fire Inspection Final Not Ready 6/8/2018 (12:30 - 2:30) 6/8/2018 (PM) 06/08/2018
Fire Inspection Final Passed 6/11/2018 (Morning) 6/11/2018 (AM) 06/11/2018
Building Final Inspection Failed 6/11/2018 (12:30 - 2:30) 6/11/2018 06/11/2018
Corrections:


Miscellaneous/Other
Carried Forward
06/11/2018
Fire suppression to be addressed and approved. Cleaning of space needed. Install appliances. E.H. To also inspect and approve space. All trade inspections to be finaled.

Miscellaneous/Other
Carried Forward
06/11/2018
1) Complete all installations. 2) complete cleaning of space, including at ceiling. 3) Environmental Health has a list of corrections, complete these corrections and call for reinspection. 4) plumbing ... floor drain needed at hot tray location in front serving area, fire stop will be needed for the piping and inspection of the firestop for this drain. 5) air balancing needed. Not approved to train.

Building Final Inspection Passed w/ Conditions 6/18/2018 (10:00 - 12:00) 6/18/2018 06/18/2018
Corrections:


Miscellaneous/Other
Resolved
06/18/2018
Fire suppression to be addressed and approved. Cleaning of space needed. Install appliances. E.H. To also inspect and approve space. All trade inspections to be finaled.

Miscellaneous/Other
Resolved
06/18/2018
1) Complete all installations. 2) complete cleaning of space, including at ceiling. 3) Environmental Health has a list of corrections, complete these corrections and call for reinspection. 4) plumbing ... floor drain needed at hot tray location in front serving area, fire stop will be needed for the piping and inspection of the firestop for this drain. 5) air balancing needed. Not approved to train.

Miscellaneous/Other
Comment Only
06/18/2018
1) Used Equipment to be cleaned per Environmental Health requirements. 2) Install vented cover at unit, and install cutting board at that piece of equipment... per Environmental Health requirements. Environmental Health to follow up with these items prior to licensing. Final for the scope of work approved.