Summary

PRBD201801959
Building
Finaled
MINNESOTA CENTER JV LLC
Alteration/Remodel
Business
Interior tenant finish for K-Force.
03/09/2018
03/30/2018
10/24/2018
04/27/2018

Locations

Permits

Permit Number: PRBD201801959

Building
Finaled
03/30/2018
10/24/2018

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Failed 4/6/2018 (8:00 - 10:00) 4/6/2018 04/06/2018
Corrections:


Miscellaneous/Other
Carried Forward
04/06/2018
Need electrical and plumbing rough in approvals. Provide city approved plans on job site showing corridor revisions.

Framing Inspection Passed w/ Conditions 4/11/2018 (8:00 - 10:00) 4/11/2018 04/11/2018
Corrections:


Miscellaneous/Other
Outstanding
04/06/2018
Need electrical and plumbing rough in approvals. Provide city approved plans on job site showing corridor revisions.

Miscellaneous/Other
Outstanding
04/11/2018
Framing - A. Framing approved with electrical and plumbing rough in approval. B. Corridor wall to be 1 layer each side, to deck above and tight around ductwork, to be inspected on final with tiles removed both sides and fire caulked. C. Fireproofing on existing steel - approved. D. Firecaulking for plumbing at floor - approved. E. PRINT CITY APPROVED DRAWINGS FOR JOBSITE FOR FINAL INSPECTION.

Fire Rating Inspection Passed 04/11/2018
Fire proofing at existing steel beams. OK. Firecaulking for plumbing floor penetrations. OK.
Corrections:


Miscellaneous/Other
Resolved
04/11/2018
Fire proofing steel beams existing and plumbing floor penetrations.

Fire Inspection Final Passed w/ Conditions 4/27/2018 (8:00 - 10:00) 4/27/2018 04/27/2018
Corrections:


Miscellaneous/Other
Comment Only
04/27/2018
Approved, pending Building Final Inspection

Building Final Inspection Passed 4/27/2018 (8:00 - 10:00) 4/27/2018 04/27/2018
Corrections:


Miscellaneous/Other
Outstanding
04/27/2018
Final - approved, contingent upon final electrical 10 day temp. for cubicals