Summary

PRBD201803586
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Remodel
Not Required
Remodel of an existing tenant space in the mall for a new Build A Bear Bakeshop.
04/23/2018
05/31/2018
01/20/2019
07/24/2018

Locations

Permits

Permit Number: PRBD201803586

Building
Finaled
05/31/2018
01/20/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Passed w/ Conditions 6/18/2018 (12:30 - 2:30) 6/18/2018 06/18/2018
Corrections:


Miscellaneous/Other
Comment Only
06/18/2018
Framing and fire stops, approved. Floor penetrations to be plate covered underneath, with pins into concrete. Call for inspection before installation of concrete.

Progress Inspection Partial Pass 7/18/2018 (10:00 - 12:00) 7/18/2018 07/18/2018
Corrections:


Miscellaneous/Other
Comment Only
07/18/2018
Questions about final. Continue work and set up temp final for use inspection.

Building Final Inspection Partial Pass 7/20/2018 (12:30 - 2:30) 7/20/2018 07/20/2018
Corrections:


Miscellaneous/Other
Outstanding
07/20/2018
1) install trap wrap to bathroom drain piping. 2) install handle and latch assembly to rear door and adjust to close on its own. 3) sign to be installed at rear hall to the exit , “ No storage by order of Fire Marshall”. ( see mall staff for the stencil they have been using) 4) cold water at sink in cashier area to be checked for flow by the plumber. 5) complete wall cowering in storefront. 6) complete the remaining work in back of store for E.H. 7) call for final fire Marshall, electrical, and building inspections. 8) complete cleaning.

Miscellaneous/Other
Comment Only
07/20/2018
E.M. Lighting approved. See the list of “outstanding “ items for the final inspection. Approved to bring in small wares, E.H. To follow up with inspection and any conditions.

Fire Inspection Final Passed 7/24/2018 (10:00 - 12:00) 7/24/2018 07/24/2018
Building Final Inspection Passed w/ Conditions 7/24/2018 (10:00 - 12:00) 7/24/2018 07/24/2018
Corrections:


Miscellaneous/Other
Comment Only
07/24/2018
Final approved and ok to open to the public, pending the final sign off of the electrical permits.