Summary

PRBD201803942
Building
Finaled
MINNESOTA CENTER JV LLC
Alteration/Remodel
Business
6th Floor of Jostens - tenant remodel
05/02/2018
05/15/2018
01/13/2019
07/17/2018

Locations

Permits

Permit Number: PRBD201803942

Building
Finaled
05/15/2018
01/13/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Passed 5/18/2018 (2:30 - 3:30) 5/18/2018 05/18/2018
Corrections:


Miscellaneous/Other
Comment Only
05/18/2018
Sixth floor framing OK. Patch fireproofing as required and call for above ceiling inspection. Call for separate inspection of the rated elevator corridor wall.

Progress Inspection Passed 6/4/2018 (10:00 - 12:00) 6/4/2018 06/04/2018
Corrections:


Miscellaneous/Other
Comment Only
06/04/2018
Progress inspection only to review needs for smoke protection of elevator lobby.

Fire Inspection Final Failed 6/28/2018 (2:30 - 3:30) 6/28/2018 06/28/2018
Building Final Inspection Failed 6/28/2018 (2:30 - 3:30) 6/28/2018 06/28/2018
Corrections:


Miscellaneous/Other
Carried Forward
06/28/2018
Provide visual axis to confirm smoke rated wall protection above all three doors. Patch as required.

Fire Inspection Final Issue TCO 6/29/2018 (8:00 - 10:00) 6/29/2018 07/02/2018
Building Final Inspection Issue TCO 6/29/2018 (10:00 - 12:00) 6/29/2018 07/02/2018
Corrections:


Miscellaneous/Other
Comment Only
07/02/2018
Three week temp occupancy approved to complete remaining fire final corrections.

Building Final Inspection VOID 07/13/2018
Corrections:


Miscellaneous/Other
Outstanding
06/28/2018
Provide visual axis to confirm smoke rated wall protection above all three doors. Patch as required.

Fire Inspection Final Passed 7/17/2018 (8:00 - 10:00) 7/17/2018 07/17/2018
Building Final Inspection Passed 7/17/2018 (8:00 - 10:00) 7/17/2018 07/17/2018