PRBD201804304
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Footing Inspection | Partial Pass | 7/11/2018 (2:30 - 3:30) | 7/11/2018 | 07/11/2018 |
Corrections:
Miscellaneous/Other
Comment Only
07/11/2018
Footings as per plans. Rebar Uprights to be wet stuck as they pour. See photo for the grounding rebar for electrical ground.
|
||||
Insulation Inspection | Partial Pass | 7/16/2018 (8:00 - 10:00) | 7/16/2018 | 07/16/2018 |
Corrections:
Miscellaneous/Other
Comment Only
07/16/2018
Foundation insulation is ridgid foam at R-10. Approved.
|
||||
Footing Inspection | Partial Pass | 7/16/2018 (8:00 - 10:00) | 7/16/2018 | 07/16/2018 |
Corrections:
Miscellaneous/Other
Comment Only
07/16/2018
Foundation wall is as is masonry block with rebar at the anchor bolt locations and core filled. Approved.
|
||||
Footing Inspection | Passed | 8/13/2018 (10:00 - 12:00) | 8/13/2018 | 08/13/2018 |
Corrections:
Miscellaneous/Other
Comment Only
08/13/2018
2 pad footings , stoop slab and the ramped entry slab with 2% slope approved for concrete.
|
||||
Framing Inspection | Passed w/ Conditions | 8/28/2018 (8:00 - 10:00) | 8/28/2018 | 08/28/2018 |
Corrections:
Miscellaneous/Other
Outstanding
08/28/2018
1) install cleat at bottom plate splices .
2) install nut and washer at anchor bolt where missing.
3) fireblock walls over 10ft in height.
Items can be viewed and insulation inspection, ok to proceed.
|
||||
Insulation Inspection | Passed | 9/12/2018 (8:00 - 10:00) | 9/12/2018 | 09/12/2018 |
Corrections:
Miscellaneous/Other
Comment Only
09/12/2018
Interior Insulation / poly approved. Ok to cover
|
||||
Lath Inspection | Passed | 9/24/2018 (10:00 - 12:00) | 9/24/2018 | 09/24/2018 |
Corrections:
Miscellaneous/Other
Comment Only
09/24/2018
Grade D paper, weeps, lathe and fastening... approved. Ok to brown coat
|
||||
Above Ceiling Inspection | Passed | 10/2/2018 (10:00 - 12:00) | 10/2/2018 | 10/02/2018 |
Corrections:
Miscellaneous/Other
Comment Only
10/02/2018
Ceiling framing and above ceiling approved.
|
||||
Fire Inspection Final | Passed w/ Conditions | 10/11/2018 (10:00 - 12:00) | 10/11/2018 | 10/11/2018 |
Corrections:
Address signage
Comment Only
10/11/2018
Address signage: Contractor will install numbers as discussed.
|
||||
Building Final Inspection | Failed | 10/11/2018 (10:00 - 12:00) | 10/11/2018 | 10/11/2018 |
Corrections:
Miscellaneous/Other
Comment Only
10/11/2018
Wash bay has FRP installed to cover all walls and ceiling, this was a change from the plans. The FRP now takes the place of the poly at the ceiling as a interior barrier.
1)Electrical inspection has corrections that need to be completed and final for the building final.
2) Install cash wrap.
3) complete landscape.
4) install address numbers.
It is ok to transfer vehicles to this site and any other office items to site. No opening to public at this time till above items are completed and inspected for the building final.
|
||||
Lighting Inspection | Passed | 10/12/2018 | ||
Building Final Inspection | Passed | 11/8/2018 (10:00 - 12:00) | 11/8/2018 (AM) | 11/08/2018 |
Please insure PRDR201808378 is closed before C/O | ||||
Corrections:
Miscellaneous/Other
Comment Only
11/08/2018
I would add protection for around gas meter.
|