PRBD201805644
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Fire Rated Assemblies Inspection | Passed | 08/14/2018 | ||
Corrections:
Miscellaneous/Other
Resolved
08/14/2018
4th floor men’s women’s restroom. A. Existing 2 hr rated building shaft between restrooms. B. Contractor on site - Patching holes, adding layers of gypsum for compliance. C. Firecaulk floor penetrations for plumbing, and other.
|
||||
Gypsum Board/Sheet Rock Inspection | Passed | 08/14/2018 | ||
4th floor - Men’s,women’s restrooms - A. 2hr rated existing gypsum shaft between men’s women’s restrooms. A. Contractor on site. Repairing holes, adding layers of gypsum for compliant 2 layers for 2 hr shaft wall. | ||||
Corrections:
Miscellaneous/Other
Resolved
08/14/2018
Gypsum inspection of existing restrooms for two hr rated shaft common wall.
|
||||
Framing Inspection | Passed | 8/14/2018 (10:00 - 12:00) | 8/14/2018 | 08/14/2018 |
4th floor men’s women’s restroom remodel. A. Accessibility, ambulatory stall configuration in men’s and women’s restrooms. | ||||
Corrections:
Miscellaneous/Other
Comment Only
08/14/2018
Framing - approved. A. Call for all electrical and HVAC ?, and fire sprinkler inspections required. OK TO PROCEED. George is doing an excellent job with difficult existing shaft wall and firecaulking.
|
||||
Building Final Inspection | Partial Pass | 10/17/2018 (10:00 - 12:00) | 10/17/2018 | 10/17/2018 |
Need fire sprinkler/fire marshal final, and electrical, and plumbing final inspections. Building final - approved- partial pass until all other inspections are final. | ||||
Corrections:
Miscellaneous/Other
Carried Forward
10/17/2018
Final. A. Building final is approved, but can not final until all trade inspections 1. Fire final, 2. Electrical final, 3. Plumbing final inspection. NO PERMIT CARD ON SITE.
|
||||
Fire Inspection Final | Passed | 10/17/2018 (10:00 - 12:00) | 10/17/2018 | 10/17/2018 |
Building Final Inspection | Passed | 10/22/2018 | ||
Corrections:
Miscellaneous/Other
Outstanding
10/17/2018
Final. A. Building final is approved, but can not final until all trade inspections 1. Fire final, 2. Electrical final, 3. Plumbing final.inspection.
|