Summary

PRBD201805644
Building
Finaled
GKII NORTHLAND CENTER LLC
Alteration/Remodel
Not Required
Interior improvements.
06/08/2018
06/25/2018
04/20/2019
10/22/2018

Locations

Permits

Permit Number: PRBD201805644

Building
Finaled
06/25/2018
04/20/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Fire Rated Assemblies Inspection Passed 08/14/2018
Corrections:


Miscellaneous/Other
Resolved
08/14/2018
4th floor men’s women’s restroom. A. Existing 2 hr rated building shaft between restrooms. B. Contractor on site - Patching holes, adding layers of gypsum for compliance. C. Firecaulk floor penetrations for plumbing, and other.

Gypsum Board/Sheet Rock Inspection Passed 08/14/2018
4th floor - Men’s,women’s restrooms - A. 2hr rated existing gypsum shaft between men’s women’s restrooms. A. Contractor on site. Repairing holes, adding layers of gypsum for compliant 2 layers for 2 hr shaft wall.
Corrections:


Miscellaneous/Other
Resolved
08/14/2018
Gypsum inspection of existing restrooms for two hr rated shaft common wall.

Framing Inspection Passed 8/14/2018 (10:00 - 12:00) 8/14/2018 08/14/2018
4th floor men’s women’s restroom remodel. A. Accessibility, ambulatory stall configuration in men’s and women’s restrooms.
Corrections:


Miscellaneous/Other
Comment Only
08/14/2018
Framing - approved. A. Call for all electrical and HVAC ?, and fire sprinkler inspections required. OK TO PROCEED. George is doing an excellent job with difficult existing shaft wall and firecaulking.

Building Final Inspection Partial Pass 10/17/2018 (10:00 - 12:00) 10/17/2018 10/17/2018
Need fire sprinkler/fire marshal final, and electrical, and plumbing final inspections. Building final - approved- partial pass until all other inspections are final.
Corrections:


Miscellaneous/Other
Carried Forward
10/17/2018
Final. A. Building final is approved, but can not final until all trade inspections 1. Fire final, 2. Electrical final, 3. Plumbing final inspection. NO PERMIT CARD ON SITE.

Fire Inspection Final Passed 10/17/2018 (10:00 - 12:00) 10/17/2018 10/17/2018
Building Final Inspection Passed 10/22/2018
Corrections:


Miscellaneous/Other
Outstanding
10/17/2018
Final. A. Building final is approved, but can not final until all trade inspections 1. Fire final, 2. Electrical final, 3. Plumbing final.inspection.