PRBD201806484
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Partial Pass | 08/23/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
08/23/2018
All areas are covered. Some sheets removed to view firestops at floor. Approved firestops.
Remaining framing was not viewed for the wall infills and remaining wall between storage room to showroom.
Floor penetrations to be viewed before concrete is put in place for fill.
|
||||
Framing Inspection | Passed | 8/24/2018 (12:30 - 2:30) | 8/24/2018 | 08/24/2018 |
Corrections:
Miscellaneous/Other
Comment Only
08/24/2018
Floor penetrations are covered from the underside and a pin into concrete... approved to fill with concrete.
Firestop at through floor plumbing approved.
|
||||
Fire Inspection Final | Passed | 9/19/2018 (12:30 - 2:30) | 9/19/2018 | 09/19/2018 |
Building Final Inspection | Partial Pass | 9/19/2018 (12:30 - 2:30) | 9/19/2018 | 09/19/2018 |
Corrections:
Miscellaneous/Other
Comment Only
09/19/2018
Cashwrap approved.
Contractor to stencil “no storage “ at top storage racks.
1) Electrical final needed.
2) need to inspect bathroom with final.
Temp for stock and training approved.
|
||||
Building Final Inspection | Passed w/ Conditions | 10/3/2018 (10:00 - 12:00) | 10/3/2018 | 10/03/2018 |
Corrections:
Miscellaneous/Other
Comment Only
10/03/2018
Final approved.
Verbal correction... remove shelves over toilet.
|