Summary

PRBD201807278
Building
Expired
G&I VIII WF PLAZA LLC
Alteration/Remodel
Not Required
Interior remodeling of existing office space with new office space and associated support space. 3rd floor remodeling, approx. 6,818 SF
07/11/2018
08/08/2018
04/15/2019

Locations

Permits

Permit Number: PRBD201807278

Building
Expired
08/08/2018
04/15/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Above Ceiling Inspection Pending
Contractor cancelled due to sprinkler not being inspected yet.mshulfer 10/10/2018 11:43 AM
Progress Inspection Pending
Contractor cancelled due to sprinkler not being inspected yet. mshulfer 10/10/2018 11:43 AM
Framing Inspection Passed w/ Conditions 8/16/2018 (8:00 - 10:00) 8/16/2018 08/16/2018
Corrections:


Miscellaneous/Other
Outstanding
08/16/2018
HVAC permit and requires above ceiling inspection. Need voice activated audibl and strobe fire alarm warning in new conference room.

Fire Rated Assemblies Inspection Passed 08/16/2018
Firecaulk system - plumbing and electrical floor penetrations. Approved.
Progress Inspection Partial Pass 9/12/2018 (Afternoon) 9/12/2018 09/12/2018
Corrections:


Miscellaneous/Other
Outstanding
09/12/2018
Progress - A. Conference room-2 floor penetrations in concrete floor - 2 hr rating required. Need floor box rated information. B. Existing electrical room - over 1500 amps and 2 panels, requires a rated door with closer and smoke gasket, and a rated 1 hour ceiling by metal studs and two layers of fire rated gypsum. C. Cabinets with sink upon final - max counter top height 34 inch AFF.

Above Ceiling Inspection Partial Pass 9/12/2018 (Afternoon) 9/12/2018 09/12/2018
Corrections:


Miscellaneous/Other
Outstanding
09/12/2018
Conference room - A. Need 2 rated floor box. B. Need one hour rated ceiling of existing electrical room, and a 45 min rated door w/closer, and smoke gasket on rated door.

Fire Inspection Final Passed 10/17/2018 (8:00 - 10:00) 10/17/2018 10/17/2018
Contractor cancelled due to sprinkler not being inspected yet.mshulfer 10/10/2018 11:44 AM
Building Final Inspection Passed 10/17/2018
see notes under inspector notes regarding the FSS needing to be scheduled before FINAL can be scheduled. mshulfer 10/09/2018 11:48 AM
Corrections:


Miscellaneous/Other
Comment Only
10/17/2018
Final building and electrical - approved. Fire alarm testing this week. This final is contingent upon fire alarm and strobe testing.