Summary

PRBD201807891
Building
Finaled
OXBORO BLOOMINGTON RETAIL CENTER LLC
Alteration/Remodel
Business
Remodel existing space for Totally Tan new tenant
07/23/2018
09/14/2018
11/16/2019
05/20/2019

Locations

Permits

Permit Number: PRBD201807891

Building
Finaled

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 10/23/2018 (10:00 - 12:00) 10/23/2018 10/23/2018
Corrections:


Miscellaneous/Other
Comment Only
10/23/2018
Wall framing approved. Change in plans for change in location of float room and shower, changing area and filtration pump room. Approved per inspection,,, see photo.

Framing Inspection Passed 11/13/2018 (8:00 - 10:00) 11/13/2018 (AM) 11/13/2018
Corrections:


Miscellaneous/Other
Comment Only
11/13/2018
Above ceiling and suspended ceiling install approved

Fire Inspection Final Not Ready 12/18/2018 (12:30 - 2:30) 12/18/2018 (PM) 12/18/2018
Building Final Inspection Not Ready 12/18/2018 (12:30 - 2:30) 12/18/2018 (PM) 12/18/2018
Corrections:


Miscellaneous/Other
Comment Only
12/18/2018
All trade inspections to be final for building final. Environmental health to also inspect as per their requirements. Continue work and call for inspections.

Fire Inspection Final Passed 1/2/2019 (2:30 - 3:30) 1/2/2019 (PM) 01/02/2019
Building Final Inspection Partial Pass 12/21/2018 (12:30 - 2:30) 01/02/2019
12/21/18: will reschedule for next week. dheile 12/21/2018 10:23 AM
Corrections:


Miscellaneous/Other
Comment Only
01/02/2019
Cashwrap has a minor deviation from plans with the angled corner of desk, that angle has been eliminated. The accessible portion of desk is on the side and is a side approach for the depth of the counter... this meets the intent of the accessibility code. Issues with UL listing of the float tank and the cocoon bed , these rooms are not to be used pending the electrical listing and inspection. Any coat hooks that are installed should comply with accessibility for 1 of each type of tanning unit. Approved for temp and to open to public pending final reinspection to close permits. The cocoon room can be used once the UL listing has been verified and approved by electrical inspector.

Building Final Inspection Partial Pass 1/2/2019 (2:30 - 3:30) 1/2/2019 (PM) 01/03/2019
Corrections:


Miscellaneous/Other
Comment Only
01/03/2019
Deviation with the cashwrap removed the angled portion of the cashwrap and the end of counter is a side approach for the width of counter. This meets the intent of the accessibility code requirements. Coat or garment hooks to be installed in rooms to also meet reach range heights for accessibility. Due to UL listing issue with the float tank and the cocoon bed these rooms shall not be used by public till all electrical requirements have been addressed and a final inspection by electrical and building for the full permit final. The cocoon room can be opened for public use once electrical inspection later this week has approved the equipment. All other rooms are approved for public use at this time. Full final is pending the final inspection of float tank by electrical and EH & building inspection. Temp is approved and is pending the final for this permit and full use of space.

Building Final Inspection Passed 5/20/2019 (10:00 - 12:00) 5/20/2019 (AM) 05/20/2019
Corrections:


Miscellaneous/Other
Comment Only
05/20/2019
Final approved pending fire inspection sign off with this permit.

Fire Inspection Final Passed 12/21/2018 (12:30 - 2:30) 05/20/2019
12/21/18: will reschedule for next week. dheile 12/21/2018 10:23 AM
Corrections:


Miscellaneous/Other
Comment Only
05/20/2019
Fire final approved per K. kaiser