Permit Application Status

PRBD201808038


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201808038
Building
Expired
BLN OFFICE PARK ASSOC
Alteration/Remodel
Business
Remodel of the lower level. Adding conference, training rooms and restroom upgrades.
07/25/2018
08/29/2018
07/28/2019

Locations

Permits

Permit Number: PRBD201808038

Building
Expired
08/29/2018
07/28/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Building Final Inspection Pending
Fire Inspection Final Pending
Corrections:


Miscellaneous/Other
Outstanding
01/29/2019
Need to close out all life safety permits. Sprinkler permit for Ansul system failed test.

Framing Inspection Not Ready 11/20/2018 (8:00 - 10:00) 11/20/2018 (AM) 11/20/2018
Corrections:


Miscellaneous/Other
Comment Only
11/20/2018
Inspection called in on the wrong permit.

Framing Inspection Partial Pass 12/4/2018 (8:00 - 10:00) 12/4/2018 (AM) 12/04/2018
Corrections:


Miscellaneous/Other
Comment Only
12/04/2018
Framing at cafe area, hard lid ceiling, conference lobby soffit, approved for framing . Covering can be done when mechanical and fire sprinkler has been inspected and approved.

Framing Inspection Partial Pass 12/21/2018 (10:00 - 12:00) 12/21/2018 (AM) 12/21/2018
Corrections:


Miscellaneous/Other
Comment Only
12/21/2018
Framing at common areas lower level approved, above ceiling approved.

Framing Inspection Passed 1/2/2019 (10:00 - 12:00) 1/2/2019 (AM) 01/02/2019
Corrections:


Miscellaneous/Other
Comment Only
01/02/2019
Above ceiling and ceiling framing approved, ok to cover.

Building Final Inspection Partial Pass 1/29/2019 (10:00 - 12:00) 1/29/2019 (AM) 01/29/2019
1/29/19: As far as I can tell, all the trades and probably a FS is not finaled for this, the General said he would have his subs call in their own inspections. I don't want to waste you time, but maybe they will get scheduled by Monday. MS
Corrections:


Miscellaneous/Other
Comment Only
01/29/2019
1) Install transition at concrete to tile floor edge. 2) final setup of tables to be in place for final, cannot block exit path or exit. 3) All associated permits to be approved for final with this part of project. 4) fire marshal approval needed for final. Approval to stock , setup, and open for use with final inspection to follow when fully setup and completed.

Fire Inspection Final Failed 1/29/2019 (10:00 - 12:00) 1/29/2019 (AM) 01/29/2019
1/29/19: As far as I can tell, all the trades and probably a FS is not finaled for this, the General said he would have his subs call in their own inspections. I don't want to waste you time, but maybe they will get scheduled by Monday. MS
Corrections:


Miscellaneous/Other
Outstanding
01/29/2019
Need to close out all life safety permits. Sprinkler permit for Ansul system failed test.