Permit Application Status

PRBD201808283


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201808283
Building
Expired
MOAC MALL HOLDINGS LLC
Alteration/Remodel
Not Required
Popeyes. Build out of existing space 391 South Avenue, mall of america. Includes general construction, mechanical, electrical and plumbing.
07/30/2018
09/19/2018
06/16/2019

Locations

Permits

Permit Number: PRBD201808283

Building
Expired
09/19/2018
06/16/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Building Final Inspection Pending
Framing Inspection Passed 11/19/2018 (8:00 - 10:00) 11/19/2018 (AM) 11/19/2018
11/15/18 framing inspection cancelled by contractor. vcarlson 11/14/2018 9:05 AM
Corrections:


Miscellaneous/Other
Comment Only
11/19/2018
Framing approved. 1) Fire stops to be viewed from below since 11 fire collars also to be viewed. 2) Wood at storefront have gypsum installed underneath, against framing.

Above Ceiling Inspection Passed 12/14/2018 (10:00 - 12:00) 12/14/2018 (AM) 12/14/2018
Corrections:


Miscellaneous/Other
Outstanding
12/14/2018
Piping in ceiling was cut and abandoned,( could not verify if metal or plastic) install appropriate firestop to pipe. Located 5 ft back into space above the kitchen equipment from the floor above. Same location... remove lose insulation or properly wrap the duct where insulation is torn away. Recheck at next inspection.

Miscellaneous/Other
Comment Only
12/14/2018
Above ceiling approved pending the correction of “outstanding “ being done. Will reinspect at next inspection.

Fire Inspection Final Passed 12/17/2018 (2:30 - 3:30) 12/17/2018 (PM) 12/17/2018
Building Final Inspection Failed 12/17/2018 (2:30 - 3:30) 12/17/2018 (PM) 12/17/2018
Corrections:


Miscellaneous/Other
Comment Only
12/17/2018
Extensive corrections with E.H. And plumbing corrections. No temp at this time, correct items and call for inspection.

Building Final Inspection Partial Pass 12/18/2018 (2:30 - 3:30) 12/18/2018 (PM) 12/18/2018
Corrections:


Miscellaneous/Other
Comment Only
12/18/2018
Approval to open for business to public... final is pending approval by E.H. And a set completion date is for 1/7/19 for all E.H. Approval final.