Permit Application Status

PRBD201808337


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201808337
Building
Finaled
Nick Mauk
Alteration/Remodel
Not Required
Remodel 650 sf of floor space on the second floor of the building. The remodel will include the following: Installation of a new concrete floor, Demolition of two offices, New walls and ceiling, Modify the existing Fire protection system, Installation of two computer room Air Conditioners, Installation of two Uninterruptible Power Supply Systems, Installation of Computer Racks.
07/31/2018
08/28/2018
07/21/2019
01/22/2019

Locations

Permits

Permit Number: PRBD201808337

Building
Finaled
08/28/2018
07/21/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 10/3/2018 (10:00 - 12:00) 10/3/2018 10/03/2018
Corrections:


Miscellaneous/Other
Comment Only
10/03/2018
IT room wall framing.... installed shaft wall as noted 13x on plans, fire saying done at pan ceiling/wall connection. Conventional metal framing for end walls. Framing approved.

Fire Inspection Final Passed 1/22/2019 (10:00 - 12:00) 1/22/2019 (AM) 01/22/2019
Building Final Inspection Passed 1/22/2019 (10:00 - 12:00) 1/22/2019 (AM) 01/22/2019
Corrections:


Miscellaneous/Other
Comment Only
01/22/2019
Final approved.