Permit Application Status

PRBD201808522


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201808522
Building
Finaled
CYPRESS SEMICONDUCTOR INC
Alteration/Remodel
Not Required
Build a clean room inside an existing clean room. Excavate and place a concrete pad for an Make up air units(2) on exterior of building
08/01/2018
08/24/2018
07/21/2019
01/22/2019

Locations

Permits

Permit Number: PRBD201808522

Building
Finaled
08/24/2018
07/21/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Footing Inspection Partial Pass 9/6/2018 (12:30 - 2:30) 9/6/2018 09/06/2018
Corrections:


Miscellaneous/Other
Comment Only
09/06/2018
Footings and rebar approved to place concrete.

Footing Inspection Failed 9/27/2018 09/27/2018
Corrections:


Miscellaneous/Other
Comment Only
09/27/2018
Rebar is not ready for inspection , call and set up inspection when ready.

Footing Inspection Passed 10/4/2018 (8:00 - 10:00) 10/4/2018 10/04/2018
Corrections:


Miscellaneous/Other
Comment Only
10/04/2018
Rebar installation is as per design. Approved to place concrete.

Framing Inspection Passed 11/8/2018 (12:30 - 2:30) 11/8/2018 (PM) 11/08/2018
Corrections:


Miscellaneous/Other
Comment Only
11/08/2018
Above ceiling approved.

Fire Inspection Final Failed 12/17/2018 (8:00 - 10:00) 12/17/2018 (AM) 12/17/2018
Corrections:


Miscellaneous/Other
Outstanding
12/17/2018
Fire Final Not Approved. Need to close out fire alarm and sprinkler permits prior to Fire Final for building permit.

Building Final Inspection Failed 12/17/2018 (8:00 - 10:00) 12/17/2018 (AM) 12/17/2018
Corrections:


Miscellaneous/Other
Comment Only
12/17/2018
Open permits... Hvac 201813236, Sprinkler 201812239, Electrical 201814174, Alarm 201814172. These permits need have inspections performed and to be closed out for final of the building permit. Call in for all inspections prior to obtaining building final.

Fire Inspection Final Passed 1/22/2019 (8:00 - 10:00) 1/22/2019 (AM) 01/22/2019
Building Final Inspection Passed 1/22/2019 (8:00 - 10:00) 1/22/2019 (AM) 01/22/2019
Corrections:


Miscellaneous/Other
Outstanding
01/22/2019
Final approved pending mechanical permit final with balancing report needed and sent to Inspector.