PRBD201809098
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Partial Pass | 9/11/2018 (12:30 - 2:30) | 9/11/2018 | 09/11/2018 |
Existing tenant remodel. A. Build large conference room, and large mail. B. Move 5 VAV ceiling units from conference room ceiling. C. Exit signs and horn strobes on generator electrical circuit for conference rooms. D. Call for above ceiling after all trade inspections rough ins. | ||||
Corrections:
Miscellaneous/Other
Outstanding
09/11/2018
Framing progress - approved. A. 4 inch Floor penetrations for electrical and data having 2 hr rated floor boxes, in conference room. B. EXIT SIGNS AND EM LIGHTING ON GENERATOR CIRCUIT,UPON FINAL. C. CALL FOR BUILDING INSPECTION ABOVE CEILING INSPECTION, AFTER TRADE ROUGH IN INSPECTIONS.
|
||||
Framing Inspection | Passed | 10/8/2018 (2:30 - 3:30) | 10/8/2018 | 10/08/2018 |
Above ceiling - A. NEED above ceiling fire sprinkler rough in and three -2 hr rated floor boxes for electrical thru concrete floor, under conference table. Horn strobes on ceiling are installed. | ||||
Above Ceiling Inspection | Passed | 10/08/2018 | ||
Above ceiling - need fire sprinkler rough in prior to covering. No rated walls at new conference room exterior walls for sound only to deck above. No firecaulking required at wall penetrations above ceiling. | ||||
Corrections:
Miscellaneous/Other
Outstanding
10/08/2018
Above ceiling - approved for all trades, except fire sprinkler needs rough in inspection above ceiling. Sound walls at new conference room to deck above, not fire rated walls, no caulking required.
|
||||
Above Ceiling Inspection | VOID | 10/29/2018 | ||
Fire Inspection Final | Passed | 11/1/2018 (12:30 - 2:30) | 11/1/2018 (PM) | 11/01/2018 |
Building Final Inspection | Passed | 11/1/2018 (12:30 - 2:30) | 11/1/2018 (PM) | 11/01/2018 |