Permit Application Status

PRBD201809558


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201809558
Building
Finaled
MSP SOUTHPOINT EQUITIES LLC
Alteration/Remodel
Not Required
Interior improvements. Southpoint Fitness Center
08/22/2018
09/05/2018
08/27/2019
02/28/2019

Locations

Permits

Permit Number: PRBD201809558

Building
Finaled
09/05/2018
08/27/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 10/29/2018 (8:00 - 10:00) 10/29/2018 (AM) 10/29/2018
Framing- A NO WALL ROUGH IN SIGNATURES ON PERMIT CARD FOR TRADES- A. electrical, B. plumbing. C. WALL FRAMING - PARTIAL APPROVED ONLY. NO ONE FROM CRAWFORD MERTZ ON SITE.
Corrections:


Miscellaneous/Other
Carried Forward
10/29/2018
Framing request - A. Permit card has no electrical or plumbing rough in signatures on card. B. IF THESE WERE INSPECTED BY BLOOMINGTON...the permit card was not posted on site. This is THE PERMIT HOLDERS FAULT. DO NOT COVER, UNTIL CONFIRMING THE ABOVE.

Framing Inspection Passed 11/6/2018 (12:30 - 2:30) 11/6/2018 (PM) 11/06/2018
Corrections:


Miscellaneous/Other
Outstanding
10/29/2018
Framing request - A. Permit card has no electrical or plumbing rough in signatures on card. B. IF THESE WERE INSPECTED BY BLOOMINGTON...the permit card was not posted on site. This is THE PERMIT HOLDERS FAULT. DO NOT COVER, UNTIL CONFIRMING THE ABOVE.

Fire Inspection Final Not Ready 12/19/2018 (10:00 - 12:00) 12/19/2018 (AM) 12/19/2018
Nick called to cancel his inspection for final today with fire and bldg as plumbing was not ready; I called Kris and Brian. jsmidt 12/19/2018 10:36 AM
Building Final Inspection Failed 12/19/2018 (10:00 - 12:00) 12/19/2018 (AM) 12/19/2018
Accessible transfer showers - back wall and seat required. Fire sprinkler 10-12 - painted sprinkler heads, all to be replaced. Mag loc entry/exit door must open and drop off on fire alarm. Occupant load should be less than 50, or exit door hardware is wrong type.
Fire Inspection Final Failed 1/3/2019 (8:00 - 10:00) 1/3/2019 (AM) 01/03/2019
Corrections:


Miscellaneous/Other
Carried Forward
01/03/2019
Fire alarm and access control must be tested.

Building Final Inspection Partial Pass 1/3/2019 (8:00 - 10:00) 1/3/2019 (AM) 01/03/2019
Corrections:


Miscellaneous/Other
Carried Forward
01/03/2019
Final for new fitness center- pending....A. Men’s & women’s transfer type accessible shower wall and seat, including all horizontal and vertical grab bars must be installed. B Two - existing 3 riser stairways serving the spinning room, as part of the whole new fitness center, requires handrails with 12 inch horizontal extensions and returned ends, where practically feasible, on both sides of stairways, at a height of 34-38 inches above the tread nosings of the two stairways. C. Final of all other trade inspections.

Fire Inspection Final Passed 2/28/2019 (10:00 - 12:00) 2/28/2019 (AM) 02/28/2019
Corrections:


Miscellaneous/Other
Outstanding
01/03/2019
Fire alarm and access control must be tested.

Building Final Inspection Passed 2/28/2019 (10:00 - 12:00) 2/28/2019 (AM) 02/28/2019
Corrections:


Miscellaneous/Other
Outstanding
01/03/2019
Final for new fitness center- pending....A. Men’s & women’s transfer type accessible shower wall and seat, including all horizontal and vertical grab bars must be installed. B Two - existing 3 riser stairways serving the spinning room, as part of the whole new fitness center, requires handrails with 12 inch horizontal extensions and returned ends, where practically feasible, on both sides of stairways, at a height of 34-38 inches above the tread nosings of the two stairways. C. Final of all other trade inspections.