PRBD201809884
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Framing Inspection | Partial Pass | 9/28/2018 (2:30 - 3:30) | 9/28/2018 | 09/28/2018 |
|
Corrections:
Miscellaneous/Other
Outstanding
09/28/2018
Framing - A. wall framing-ok. B. Scrim foil protect exterior rim of existing building for exposed wood and paper faced insulation. C. Patch fireproofing on existing steel beams. D. Plumbing firecaulking penetrations complete.
E. ALL Thru floor electrical in EXISTING FLOOR - TO BE 2 HR RATED, F. Exit doors from space to elevator lobby - large amount of glazing is firelite glass, confirm on final. G. Call for above ceiling inspection when ready.
Thank you Ben for all your professionalism.
|
||||
| Framing Inspection | Passed | 10/11/2018 (10:00 - 12:00) | 10/11/2018 | 10/11/2018 |
| Fire Rated Assemblies Inspection | Passed | 10/11/2018 | ||
| Scrim foil over existing rim. Patch existing fireproofing of steel beams. | ||||
|
Corrections:
Miscellaneous/Other
Comment Only
10/11/2018
Please disregard inspector computer error for fire inspection Pass, as it was supposed to be fire rated assembly pass.
|
||||
| Fire Inspection Final | Passed | 10/26/2018 (12:30 - 2:30) | 10/26/2018 (PM) | 10/26/2018 |
| Building Final Inspection | Passed | 10/26/2018 (12:30 - 2:30) | 10/26/2018 (PM) | 10/26/2018 |