Summary

PRBD201810441
Building
Finaled
ACORN MINI-STORAGE XIV LLC
Alteration/Remodel
Storage, low hazard
Business
Remodel existing building into Mini storage. Including site work- Phase 1
09/07/2018
09/13/2018
04/29/2020
11/01/2019

Locations

Permits

Permit Number: PRBD201810441

Building
Finaled
09/13/2018
04/29/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Insulation Inspection Partial Pass 9/21/2018 (12:30 - 2:30) 9/21/2018 09/21/2018
Insulation: framing - Site meeting for large commercial building turning into storage units, exterior walls concrete panels. Contractor installing interior side wall insulation, foil faced fire rated, exposed above storage unit rear walls, in a sprinklered storage building.
Insulation Inspection Partial Pass 9/24/2018 (10:00 - 12:00) 9/24/2018 09/25/2018
Contrator called at 3:00 to re-schedule per BPost. ajacobson 09/21/2018 3:08 PM
Corrections:


Miscellaneous/Other
Comment Only
09/25/2018
Progress - A. Install interior side of exterior building vertical concrete prefab panels, using 2 inch Thermax brand foil face non combustible rigid sheet insulation. All seams must be taped, and all open exposed edges must be taped. B. R- Value rating 13.5 per plan. B. This is south partial area of building existing building at this time.

Footing Inspection Partial Pass 10/24/2018 (12:30 - 2:30) 10/24/2018 10/24/2018
Provide city an electronic copy of structural drawings, not submitted with building plans, for exterior stoop/column pads. A. OK TO POUR ONLY UPON SPECIAL INSPECTION. HAVE VIBRATOR ON SITE. B. NOT COMPLETELY READY TODAY, BUILDING INSPECTOR AT CLASS TOMMORROW. OK TO PROCEED.
Corrections:


Miscellaneous/Other
Outstanding
10/24/2018
Footing - 2-stoops each different, 1 small, 1 large. A. Must provide city a copy of current structural plans on site that were not submitted with the building plans. B. Have vibrator on site. C. Follow structural drawings on site. D. Provide CITY NTI SPECIAL INSPECTIONS APPROVAL FOR REINFORCEMENT, and form approval. D. ONLY POUR UPON APPROVAL OF SPECIAL INSPECTION COMPANY NTI-GEO.

Footing Inspection Passed 12/13/2018 (Afternoon) 12/13/2018 (PM) 12/14/2018
Visual of in the process of installing crush Bowes boxes For exterior stoop slab concrete
Above Ceiling Inspection Passed 01/22/2019
Framing Inspection Passed 10/26/2018 (8:00 - 10:00) 01/22/2019
Interior framing of storage units with additional accessible storage garages.
Insulation Inspection Passed 01/22/2019
Interior fire resistance Thermax insulation per plan against interior side of exterior wall and windows, per plan.
Housewrap Inspection Passed 01/22/2019
Building Final Inspection Issue TCO 1/29/2019 (12:30 - 2:30) 1/29/2019 (PM) 01/22/2019
Pending - A. Planning INSPECTION FOR exterior parking lot lighting, landscape plan and sod, exterior signage, require final. B. Lower 2 interior exit signs, add one additional exit sign north courtyard main entry and exit. C. All other open electrical and fire permit issues. D. CLOSE OPEN ROOF PERMIT. F. ALSO SEE PERMIT 201811636, FOR OTHER ADDITIONAL ITEMS.
Fire Inspection Final Passed 1/29/2019 (12:30 - 2:30) 04/09/2019
Building Final Inspection Passed 11/01/2019