There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Insulation Inspection | Partial Pass | 9/21/2018 (12:30 - 2:30) | 9/21/2018 | 09/21/2018 |
Insulation: framing - Site meeting for large commercial building turning into storage units, exterior walls concrete panels. Contractor installing interior side wall insulation, foil faced fire rated, exposed above storage unit rear walls, in a sprinklered storage building. | ||||
Insulation Inspection | Partial Pass | 9/24/2018 (10:00 - 12:00) | 9/24/2018 | 09/25/2018 |
Contrator called at 3:00 to re-schedule per BPost. ajacobson 09/21/2018 3:08 PM | ||||
Corrections:
Miscellaneous/Other
Comment Only
09/25/2018
Progress - A. Install interior side of exterior building vertical concrete prefab panels, using 2 inch Thermax brand foil face non combustible rigid sheet insulation. All seams must be taped, and all open exposed edges must be taped. B. R- Value rating 13.5 per plan. B. This is south partial area of building existing building at this time.
|
||||
Footing Inspection | Partial Pass | 10/24/2018 (12:30 - 2:30) | 10/24/2018 | 10/24/2018 |
Provide city an electronic copy of structural drawings, not submitted with building plans, for exterior stoop/column pads. A. OK TO POUR ONLY UPON SPECIAL INSPECTION. HAVE VIBRATOR ON SITE. B. NOT COMPLETELY READY TODAY, BUILDING INSPECTOR AT CLASS TOMMORROW. OK TO PROCEED. | ||||
Corrections:
Miscellaneous/Other
Outstanding
10/24/2018
Footing - 2-stoops each different, 1 small, 1 large. A. Must provide city a copy of current structural plans on site that were not submitted with the building plans. B. Have vibrator on site.
C. Follow structural drawings on site. D. Provide CITY NTI SPECIAL INSPECTIONS APPROVAL FOR REINFORCEMENT, and form approval. D. ONLY POUR UPON APPROVAL OF SPECIAL INSPECTION COMPANY NTI-GEO.
|
||||
Footing Inspection | Passed | 12/13/2018 (Afternoon) | 12/13/2018 (PM) | 12/14/2018 |
Visual of in the process of installing crush Bowes boxes For exterior stoop slab concrete | ||||
Above Ceiling Inspection | Passed | 01/22/2019 | ||
Framing Inspection | Passed | 10/26/2018 (8:00 - 10:00) | 01/22/2019 | |
Interior framing of storage units with additional accessible storage garages. | ||||
Insulation Inspection | Passed | 01/22/2019 | ||
Interior fire resistance Thermax insulation per plan against interior side of exterior wall and windows, per plan. | ||||
Housewrap Inspection | Passed | 01/22/2019 | ||
Building Final Inspection | Issue TCO | 1/29/2019 (12:30 - 2:30) | 1/29/2019 (PM) | 01/22/2019 |
Pending - A. Planning INSPECTION FOR exterior parking lot lighting, landscape plan and sod, exterior signage, require final. B. Lower 2 interior exit signs, add one additional exit sign north courtyard main entry and exit. C. All other open electrical and fire permit issues. D. CLOSE OPEN ROOF PERMIT. F. ALSO SEE PERMIT 201811636, FOR OTHER ADDITIONAL ITEMS. | ||||
Fire Inspection Final | Passed | 1/29/2019 (12:30 - 2:30) | 04/09/2019 | |
Building Final Inspection | Passed | 11/01/2019 |