PRBD201811636
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Building Final Inspection | Issue TCO | 5/28/2019 (12:30 - 2:30) | 5/28/2019 (PM) | 05/28/2019 |
Corrections:
Miscellaneous/Other
Carried Forward
05/28/2019
Temp occupancy - phase 2 cold storage for Building and Fire-30 days. Approved.
Note - A. Phase 1, remove plumbing vent cap above office ROOF and others. B. FINAL FROM PLANNING FOR EXTERIOR TREE/PLANT PLANTING, AND FOR PHOTOMETRIC TESTING FOR EXTERIOR LIGHTING. C. APPROVAL OF STORM WATER PONDS. FROM ENGINEERING PER WATERSHED DISTRICT. D. SUBMIT ASBUILT UTILITY INSTALLATION BY ELECTRONIC FORMAT TO THE CITY ENGINEERING DIVISION ( Steve Segar ). D. Fire marshal approval or denial for existing north west parking space located next to exterior fire hydrant. Can view from west neighboring building drive lane. E. Final - Electric permit. F. All city council conditions, all fire marshal conditions, engineering conditions, and all building inspection and trade inspection conditions. G. TEMP OCCUPANCY ONLY APPROVED.
|
||||
Building Final Inspection | Passed | 11/01/2019 | ||
Corrections:
Miscellaneous/Other
Outstanding
05/28/2019
Temp occupancy - phase 2 cold storage for Building and Fire-30 days. Approved.
Note - A. Phase 1, remove plumbing vent cap above office ROOF and others. B. FINAL FROM PLANNING FOR EXTERIOR TREE/PLANT PLANTING, AND FOR PHOTOMETRIC TESTING FOR EXTERIOR LIGHTING. C. APPROVAL OF STORM WATER PONDS. FROM ENGINEERING PER WATERSHED DISTRICT. D. SUBMIT ASBUILT UTILITY INSTALLATION BY ELECTRONIC FORMAT TO THE CITY ENGINEERING DIVISION ( Steve Segar ). D. Fire marshal approval or denial for existing north west parking space located next to exterior fire hydrant. Can view from west neighboring building drive lane. E. Final - Electric permit. F. All city council conditions, all fire marshal conditions, engineering conditions, and all building inspection and trade inspection conditions. G. TEMP OCCUPANCY ONLY APPROVED.
|
||||
Building Final Inspection | Passed | 3/15/2019 (8:00 - 10:00) | 3/15/2019 (AM) | 11/04/2019 |
temp CO on cold storage addition per Dave at B2 651-343-8826. Says Brian knows about this and just needs to enter results/outcomes on inspection lines. mshulfer 03/14/2019 9:51 AM. SEE CORRECTIONS. Final - cold storage building - building permit #2 of 2. | ||||
Corrections:
Miscellaneous/Other
Carried Forward
03/16/2019
Temp occupancy - phase 2 cold storage for Building and Fire-30 days. Approved.
Note - Phase 1 south half of warm storage is also partial approved.
Pending items. A. All city council conditions, all fire marshal conditions, engineering conditions, and all building inspection and trade inspection conditions. B. Parking lot with striping and signage. C. Security gates, roof top screening, temp finals for all trade inspections for Phase 1 south heated storage, and phase 2 south cold storage. NOTE- Phase 2 north portion for completing the heated storage is not going to be completed until future notice.
|
||||
Fire Inspection Final | Passed | 11/05/2019 | ||
Dry system fire sprinkler coverage, off of the existing building water. |