PRBD201812454
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Framing Inspection | Passed | 1/4/2019 (10:00 - 12:00) | 1/4/2019 (AM) | 01/04/2019 |
|
Corrections:
Miscellaneous/Other
Comment Only
01/04/2019
Framing is approved, ok to cover.
One correction... add backing to secure the hanging soffit in room to, not to be secured into just drywall.
|
||||
| Fire Rough-in Inspection | Passed w/ Conditions | 3/11/2019 (12:30 - 2:30) | 3/11/2019 (PM) | 03/11/2019 |
|
Corrections:
Fire extinguisher(s) needed.
Comment Only
03/11/2019
Fire extinguisher(s). Hang fire extinguisher as discussed. 4 fire extinguisher are on site and current per service tag, just need to be hung up per discussion.
|
||||
|
Miscellaneous/Other
Comment Only
03/11/2019
Fire Marshal Final Approved, pending COB Building Inspection Final.
|
||||
| Building Final Inspection | Partial Pass | 3/13/2019 (8:00 - 10:00) | 3/13/2019 (AM) | 03/13/2019 |
|
Corrections:
Miscellaneous/Other
Carried Forward
03/13/2019
Bathrooms:
1) grab bars at roll in shower required to be at 33-36 inches max height to top of bars from floor.
2) vertical bars at toilet to have backing installed for attachment and to be 3” to max 6” of clearance from the horizontal bar. ( Both toilets).
3)install unisex signage at bathroom with shower.
4) install mirrors at both bathrooms, 40” max to bottom reflective edge from floor.
At rear door to accessible parking:
1) install signage 60” from bottom of sign to the grade.
2) 60” level and flat landing needed at door.
3) striping needed to mark space.
Call for reinspection when completed.
|
||||
|
Miscellaneous/Other
Comment Only
03/13/2019
Shower stall :
The folding chair has been replaced with a portable handicap shower chair, City has approved this as an alternative with this buildout due to the use of the space.
City of Bloomington will approve a temp occupancy for tenant use pending the above corrections are completed and inspected for final of permit and occupancy use. The parking will be done in spring, call for the inspection to close out permit.
|
||||
| Fire Inspection Final | Passed | 3/13/2019 (8:00 - 10:00) | 3/13/2019 (AM) | 03/14/2019 |
| Building Final Inspection | Partial Pass | 3/20/2019 (8:00 - 10:00) | 3/20/2019 (AM) | 03/20/2019 |
|
Corrections:
Miscellaneous/Other
Resolved
03/20/2019
Bathrooms:
1) grab bars at roll in shower required to be at 33-36 inches max height to top of bars from floor.
2) vertical bars at toilet to have backing installed for attachment and to be 3” to max 6” of clearance from the horizontal bar. ( Both toilets).
3)install unisex signage at bathroom with shower.
4) install mirrors at both bathrooms, 40” max to bottom reflective edge from floor.
At rear door to accessible parking:
1) install signage 60” from bottom of sign to the grade.
2) 60” level and flat landing needed at door.
3) striping needed to mark space.
Call for reinspection when completed.
|
||||
|
Miscellaneous/Other
Carried Forward
03/20/2019
1) install mirrors in bathrooms 40” from floor to reflective edge.
At rear door for accessibility:
2) stripe space for handicap parking and provide a 60” flat pad at door.
|
||||
|
Miscellaneous/Other
Comment Only
03/20/2019
Grab bars in bathrooms are corrected.
Note the vertical bar in the roll in shower is not required, this is required in a alternate roll in shower. Contractor left it in place at the wrong height, but is not required.
|
||||
| Building Final Inspection | Passed | 02/05/2020 | ||
|
Corrections:
Miscellaneous/Other
Comment Only
02/05/2020
1) install mirrors in bathrooms 40” from floor to reflective edge.
At rear door for accessibility:
2) stripe space for handicap parking and provide a 60” flat pad at door.
|
||||
|
Miscellaneous/Other
Comment Only
02/05/2020
Final approved.
|
||||