PRBD201812548
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Footing Inspection | Passed w/ Conditions | 12/3/2018 (8:00 - 10:00) | 12/3/2018 (AM) | 12/03/2018 |
Trash enclosure completed. NO INSPECTIONS. SEE CORRECTION NOTES. On site inspection of partially completed 12 inch cmu foundation to grade height. A. From grade visual of completed 32 INCH height of 3.5 courses of core filled cmu from top of 24 inch wide footing viewed from top only, using One #5 rebar, 24 inch on center w/ one #5 in the 2 exterior corners, and two #5 rebars at dumpster front wall edge opening. Contractor using 24 inch bar lap on #5 vertical core fill reinforcements. Sand soil visible from top view. 12 inch cmu wall to proceed by contractor. | ||||
Corrections:
Miscellaneous/Other
Comment Only
12/03/2018
First inspection per engineered plans submitted.
A. Trash enclosure completed. No city inspections requested. B. Contractor states the existing bottom of the existing footing was at 48 inch depth per the engineered drawings, and engineer approved this condition. C. Contractor states all above footing foundation specifications were met per plan, and photos were taken during construction. C. Provide letter to city from engineer of record, approving by photos, ALL CONSTRUCTION METHODS.
D. ITEMS APPROVED per engineer include but not limited to 1. special inspections 2. all
existing footing 3. installed CMU foundation, with reinforced core fills, steel reinforcement, CMU core fill and ladder joint reinforcement, bond beam with reinforcement, CMU grout construction, epoxy rebar installation, 4. all per the origional submitted engineered or modified engineered plans submitted, per the photos taken by contractor. 5. Submit letter to the city of BLOOMINGTON,inspector : B.POST@bloomingtonmn.gov.
|
||||
Building Final Inspection | Passed | 1/7/2019 (Morning) | 1/7/2019 (AM) | 01/07/2019 |
Footing Inspection | Passed | 01/07/2019 | ||
Contractor had no inspections, below grade. New footing and core filled 12 inch cmu, per plan review . | ||||
Fire Inspection Final | Passed | 01/07/2019 | ||
Exterior dumpster enclosure, no sprinkler required. | ||||
Framing Inspection | Passed | 01/07/2019 | ||
Masonry block construction with brick veneer- 3 walls, with swinging doorway in front wall, all built against shopping center exterior brick wall. No roof structure. Sloped concrete floor to exterior parking lot. |