PRBD201812852
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Partial Pass | 1/31/2019 (12:30 - 2:30) | 1/31/2019 (PM) | 01/31/2019 |
Corrections:
Miscellaneous/Other
Comment Only
01/31/2019
Boys and girls dressing room 3rd floor.
Dressing room 2005 & 2026.
Framing approved, ok to cover.
|
||||
Framing Inspection | Partial Pass | 2/15/2019 (12:30 - 2:30) | 2/15/2019 (PM) | 02/15/2019 |
Corrections:
Miscellaneous/Other
Comment Only
02/15/2019
Framing and backing in cafe bathrooms approved.above ceiling approved in these bathrooms.
|
||||
Above Ceiling Inspection | Partial Pass | 2/21/2019 (12:30 - 2:30) | 2/21/2019 (PM) | 02/21/2019 |
Corrections:
Miscellaneous/Other
Comment Only
02/21/2019
Above ceiling in rooms 2026 & 2005 approved pending fire inspection.
|
||||
Above Ceiling Inspection | Partial Pass | 2/27/2019 (12:30 - 2:30) | 2/27/2019 (PM) | 02/27/2019 |
Corrections:
Miscellaneous/Other
Comment Only
02/27/2019
3rd floor above ceiling and ceiling framing of boys and girls fitting rooms... approved to cover.
|
||||
Progress Inspection | Partial Pass | 3/20/2019 (12:30 - 2:30) | 3/20/2019 (PM) | 03/20/2019 |
Corrections:
Miscellaneous/Other
Comment Only
03/20/2019
3rd floor bathrooms approved for turnover pending inspection of the mirrors to be mounted when they arrive.
1st phase turnover of levels 1-3 approved pending the installation of the fitting room benches for all accessible fitting rooms.
Turnover is contingent on all inspections being completed as required.
Reinspection to follow prior to turnover.
|
||||
Progress Inspection | Partial Pass | 3/22/2019 (10:00 - 12:00) | 3/22/2019 (AM) | 03/22/2019 |
Corrections:
Miscellaneous/Other
Comment Only
03/22/2019
3rd floor bathrooms approved for public use.
2nd and 3rd floor fitting rooms and accessible stalls appproved. 1st level and through 3rd level of phase 1 of project approved for turnover and public use.
Note: contractor to change out fitting room signage to have Braille on signage... send picture to inspector.
|
||||
Framing Inspection | Partial Pass | 04/04/2019 | ||
Corrections:
Miscellaneous/Other
Comment Only
04/04/2019
Phase 2 of project.
1st floor sales area. Approved to one side walls and ok to cover the soffits.
Room 2035 wall infill approved to cover.
Viewed the removed section of mezzanine, more work with mezzanine will happen at a later date.
Viewed the work enclosure and exiting on level 3 for this phase of work, exiting is clearly depicted and aisle width and routing is good. This will be up for the duration of this phase of construction... approved.
|
||||
Framing Inspection | Partial Pass | 4/10/2019 (12:30 - 2:30) | 4/10/2019 (PM) | 04/10/2019 |
Corrections:
Miscellaneous/Other
Comment Only
04/10/2019
Phase 2 ... second floor fitting rooms #2040, 1st floor sales. Approved to cover.
|
||||
Above Ceiling Inspection | Partial Pass | 4/19/2019 (8:00 - 10:00) | 4/19/2019 (AM) | 04/19/2019 |
Corrections:
Miscellaneous/Other
Comment Only
04/19/2019
3rd floor bathroom, and women’s lounge above. 2nd floor order pickup. Fitting room
2057 ceiling framing.
Approved
|
||||
Above Ceiling Inspection | Partial Pass | 4/29/2019 (12:30 - 2:30) | 4/29/2019 (PM) | 04/29/2019 |
Corrections:
Miscellaneous/Other
Comment Only
04/29/2019
Walls in rooms 2048, fitting rooms 2057 approved. Ceiling framing in 2057 approved and ok to cover pending sprinkler and electrical inspections. Soffit framing that matches existing to the fronts, approved to cover once sprinklers are removed from inner framing this evening.
Call for electrical and sprinkler inspections.
|
||||
Above Ceiling Inspection | Partial Pass | 5/15/2019 (8:00 - 10:00) | 5/15/2019 (AM) | 05/15/2019 |
Corrections:
Miscellaneous/Other
Comment Only
05/15/2019
2nd floor A, B, & C. Walls ceiling framing for one of the shops, and above ceiling approved. Call for sprinkler inspection prior to covering ceiling.
|
||||
Building Final Inspection | Partial Pass | 6/5/2019 (8:00 - 10:00) | 6/5/2019 (AM) | 06/05/2019 |
Corrections:
Miscellaneous/Other
Comment Only
06/05/2019
2nd floor 2nd phase dressing room and sales area... approved, pending signage at fitting rooms.1st floor men’s shoe stock and shoes sales area approved for turnover pending the minor repairs and items for completion.
|
||||
Building Final Inspection | Partial Pass | 6/7/2019 (10:00 - 12:00) | 6/7/2019 (AM) | 06/07/2019 |
Corrections:
Miscellaneous/Other
Comment Only
06/07/2019
Phase 2,
3rd floor bathrooms approved for public use and turnover.
2nd floor vendor shops, walls approved to cover and ceiling approved.... pending electrical inspection.
|
||||
Above Ceiling Inspection | Partial Pass | 06/20/2019 | ||
Corrections:
Miscellaneous/Other
Comment Only
06/20/2019
Viewed ducting and sealing of ducts in the Gucci buildout section of Nordstroms.
Approved to insulate.
|
||||
Building Final Inspection | Partial Pass | 6/25/2019 (10:00 - 12:00) | 6/25/2019 (AM) | 06/25/2019 |
Corrections:
Miscellaneous/Other
Comment Only
06/25/2019
Phase 3... 1st and 3rd floor fitting rooms. 1033,1032,1031. Approved to cover.
|
||||
Framing Inspection | Partial Pass | 7/3/2019 (8:00 - 10:00) | 7/3/2019 (AM) | 07/03/2019 |
Corrections:
Miscellaneous/Other
Comment Only
07/03/2019
#3082 dressing room framing.
store B on 1st floor, ok to one side walls.
Fitting room on second floor ceiling framing is approved pending electrical and sprinkler inspections.
|
||||
Progress Inspection | Partial Pass | 7/16/2019 (10:00 - 12:00) | 7/16/2019 (AM) | 07/16/2019 |
Corrections:
Miscellaneous/Other
Comment Only
07/16/2019
Gucci RTW above ceiling and framing... approved to cover pending fire sprinkler inspection.
|
||||
Above Ceiling Inspection | Partial Pass | 8/1/2019 (10:00 - 12:00) | 8/1/2019 (AM) | 08/01/2019 |
Corrections:
Miscellaneous/Other
Comment Only
08/01/2019
Fitting rooms on 1 & 3 and 3rd floor sales above ceiling approved.ceiling tiles can be lifted for electrical inspection.
|
||||
Above Ceiling Inspection | Partial Pass | 8/9/2019 (12:30 - 2:30) | 8/9/2019 (PM) | 08/09/2019 |
Corrections:
Miscellaneous/Other
Comment Only
08/09/2019
Men’s bathroom on first floor room 1036 ,and the sales area, approved for use and finall pending final by other trades inspectors.
Above ceiling in Chanel accessories room 1D-22a... approved.
|
||||
Building Final Inspection | Not Ready | 8/9/2019 (12:30 - 2:30) | 8/9/2019 (PM) | 08/09/2019 |
Framing Inspection | Not Ready | 8/14/2019 (12:30 - 2:30) | 8/14/2019 (PM) | 08/14/2019 |
Corrections:
Miscellaneous/Other
Comment Only
08/14/2019
Restaurant on 3rd floor... soffit framing approved, wall framing has abandoned holes in floor to be patched and firestops that need to be completed and inspected. Reinspection needed when ready.
Dressing room on 1st level needs the bench in the accessible stall and signage installed.
Reinspection needed when ready.
|
||||
Building Final Inspection | Failed | 8/21/2019 (12:30 - 2:30) | 8/21/2019 (PM) | 08/21/2019 |
Corrections:
Miscellaneous/Other
Comment Only
08/21/2019
Not ready for the building final of this permit.
|
||||
Framing Inspection | Partial Pass | 8/21/2019 (12:30 - 2:30) | 8/21/2019 (PM) | 08/21/2019 |
Corrections:
Miscellaneous/Other
Comment Only
08/21/2019
Phase 3 of 3rd floor woman’s sales area and the 2 dressing rooms... approved pending any other trades inspections.
Framing and firestops of bar area of 3rd floor... approved
|
||||
Progress Inspection | Partial Pass | 9/9/2019 (8:00 - 10:00) | 9/9/2019 (AM) | 09/09/2019 |
2nd floor Dressing rooms framing. A. 2086, 2076, 2060. 1st floor dressing rooms framing. A. 1045. Toilet room framing. 2082. | ||||
Progress Inspection | Partial Pass | 9/16/2019 (12:30 - 2:30) | 9/16/2019 (PM) | 09/16/2019 |
Contractor called to cancel inspection for 09/13/2019 - but I did not see it. I scheduled the 9/16 inspection. jsmidt 09/11/2019 10:42 AM Framing second-floor east side changing rooms 9/16 | ||||
Progress Inspection | Partial Pass | 9/24/2019 (12:30 - 2:30) | 9/24/2019 (PM) | 09/24/2019 |
Corrections:
Miscellaneous/Other
Comment Only
09/24/2019
First floor shop C and sunshop E.
Dressing rooms 2058,76,86 above ceilings.
Room 3059 wall framing.
Walls in 3rd floor room 3d16
Approved to cover.
|
||||
Above Ceiling Inspection | Partial Pass | 10/7/2019 (8:00 - 10:00) | 10/7/2019 (AM) | 10/07/2019 |
Corrections:
Miscellaneous/Other
Comment Only
10/07/2019
Gucci shop “B” ceiling approved. Sprinkler inspection needed prior to covering. Walls at shop E 2d12e. Approved
|
||||
Fire Inspection Final | Partial Pass | 10/31/2019 | ||
Corrections:
Miscellaneous/Other
Comment Only
10/31/2019
Partial final approved except for channel 1st floor.
|
||||
Fire Inspection Final | Partial Pass | 11/5/2019 (12:30 - 2:30) | 11/5/2019 (PM) | 11/05/2019 |
Corrections:
Miscellaneous/Other
Comment Only
11/05/2019
Approved for everything but sun shop e.
|
||||
Building Final Inspection | Partial Pass | 11/5/2019 (12:30 - 2:30) | 11/5/2019 (PM) | 11/05/2019 |
Corrections:
Miscellaneous/Other
Comment Only
11/05/2019
Phase 4:
1st floor fitting rooms, Gucci and Channel...approved.
2nd floor men’s and women’s bathrooms, and sales area... approved.
Dressing rooms and sales on 3rd floor ... approved.
Ok to open these areas.
|
||||
Fire Inspection Final | Passed | 11/20/2019 (8:00 - 10:00) | 11/20/2019 (AM) | 11/20/2019 |
Building Final Inspection | Passed | 11/20/2019 (8:00 - 10:00) | 11/20/2019 (AM) | 11/20/2019 |
Corrections:
Miscellaneous/Other
Comment Only
11/20/2019
Final approved, all work completed and inspected.
|