Permit Application Status

PRBD201813732


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201813732
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
Nordstrom Bazille Remodel of an existing restaurant within an existing Nordstrom at the Mall of America. Work will entail updating finishes, new seating layout and a new interior bar. No change to allowable occupant load or egress paths.
10/31/2018
01/22/2019
04/22/2020
10/25/2019

Locations

Permits

Permit Number: PRBD201813732

Building
Finaled
01/22/2019
04/22/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Above Ceiling Inspection Passed 10/24/2019
Corrections:


Miscellaneous/Other
Comment Only
10/24/2019
Inspections were done with the inspections for the store renovation... see the permit inspection notes for inspections.

Framing Inspection Passed 10/24/2019
Corrections:


Miscellaneous/Other
Comment Only
10/24/2019
See the inspections for the renovation of Nordstroms for any inspections to this restaurant. All framing and firestops approved.

Building Final Inspection Failed 10/17/2019 (12:30 - 2:30) 10/24/2019 (PM) 10/24/2019
Corrections:


Miscellaneous/Other
Comment Only
10/24/2019
1) corrections for Environmental Health to be completed. 2) install occupancy load signage. 3) seating for accessibility to comply with the calculated load count, 9 seats to be designated for accessibility per the approved plans. 4) fire alarm and sprinkler final to be completed with inspection 5) corrections at hood and Ansil system per fire inspection to be completed. Final for this permit is not ready.

Fire Inspection Final Passed 10/24/2019 (12:30 - 2:30) 10/24/2019 (PM) 10/25/2019
Building Final Inspection Passed 10/25/2019 (2:30 - 3:30) 10/25/2019 (PM) 10/25/2019
Corrections:


Miscellaneous/Other
Comment Only
10/25/2019
Temp signage is in place until the permanent signs are made up and installed. All inspections with this remodel are completed. Ok to obtain liquor license, and ok to open to public.... Final approved.