PRBD201814107
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Pending | |||
Fire Inspection Final | Pending | |||
Building Final Inspection | Pending | |||
Footing Inspection | Not Ready | 06/11/2019 | ||
Corrections:
Miscellaneous/Other
Comment Only
06/11/2019
Contractor had the holes for footings Dug, But the rebar cages are not on site. Reinspection scheduled for 6/12 to verify rebar cage and footings. Contractor is not ready for inspection.
|
||||
Footing Inspection | Passed | 6/12/2019 (8:00 - 10:00) | 6/12/2019 (AM) | 06/12/2019 |
Corrections:
Miscellaneous/Other
Comment Only
06/12/2019
4 footings with rebar cages as per plan design....approved.
Conduit will be run into the footing for the sign .
|