Summary

PRBD201814419
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
Pour six new footings, install six new columns, six new beams, to allow us to remove three columns to provide the Mall of America and Apple with a shell space. Construct demise walls for new Apple shell space. Includes construction of shaft and back of house exit passageways.
11/20/2018
01/02/2019
06/07/2020
12/10/2019

Locations

Permits

Permit Number: PRBD201814419

Building
Finaled
01/02/2019
06/07/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Footing Inspection Partial Pass 1/18/2019 (8:00 - 10:00) 1/18/2019 (AM) 01/18/2019
Corrections:


Miscellaneous/Other
Comment Only
01/18/2019
Footings along line s7 at grids w17, w16. Footings along line s5 at grids w17, w16, w14.4. Bolt patterns are being epoxied in place when steel is to be set. Approved for concrete placement.

Miscellaneous/Other
Comment Only
01/18/2019
Footings along line s7 at grids w17, w16. Footings along line s5 at grids w17, w16, w14.4. Bolt patterns are being epoxied in place when steel is to be set. Approved for concrete placement. Call for next footing inspection.

Footing Inspection Partial Pass 3/6/2019 (12:30 - 2:30) 3/6/2019 (PM) 03/06/2019
Corrections:


Miscellaneous/Other
Comment Only
03/06/2019
Floor infills ar 2nd floor above the installed beams and at mall common area of removed walkway. Approved for concrete placement.

Footing Inspection Passed 3/12/2019 (12:30 - 2:30) 3/12/2019 (PM) 03/12/2019
Corrections:


Miscellaneous/Other
Comment Only
03/12/2019
Underslab poly, wired mesh approved. #5 rebar for the mat at the reinforced thickened section used for support of storefront, is onsite and will be set in place when concrete is being placed. Special inspector will view this at concrete placement. Approved.

Framing Inspection Partial Pass 4/8/2019 (8:00 - 10:00) 3/20/2019 (AM) 03/20/2019
Corrections:


Miscellaneous/Other
Comment Only
03/20/2019
Shaftwall framing of 2nd floor to enclose mechanical ducting....approved Existing Back wall has been adapted with 2layers of gypsum to meet 2hour rating per the UL listing provided to the framers.

Framing Inspection Partial Pass 04/01/2019
Corrections:


Miscellaneous/Other
Comment Only
04/01/2019
Apple space demising walls approved and ok to cover. Note... the demising walls for the storage locations and the extension to back of house back hallway, along with the shaft enclosure for the ducting relocation that will feed from floors1-roof do not have a permit and plans to be submitted to city of Bloomington for permit application. Inspections will follow once permit is approved.

Framing Inspection Partial Pass 04/02/2019
Corrections:


Miscellaneous/Other
Comment Only
04/02/2019
Viewed perimeter lease line wall framing of the apple tenant space. Approved. Viewed the wall framing of most the back of house cooridor being added and was not shown on the plans. 2 hour shaft for 2nd floor for the mechanical duct was inspected with the building of shaft, and first layer of shaft. The back wall of shaft has 2 layers of gypsum board added to the existing wall to rate the wall for a 2 hour rating. Approved to install the 2nd layer to that shaft framing of 2nd floor. These items viewed are not included in the permit description and to be addressed by mall and contractor for the addition to the permit of the shell work. The shaft will go up through floor and needs to be inspected as work progresses.

Framing Inspection Partial Pass 4/8/2019 (8:00 - 10:00) 4/8/2019 (AM) 04/08/2019
Corrections:


Miscellaneous/Other
Comment Only
04/08/2019
Horizontal shaft framing at duct relocation on first level approved and ok to cover. Approved to cover the corridor walls with the inner space layer to complete the rating.

Framing Inspection Partial Pass 04/18/2019
Corrections:


Miscellaneous/Other
Comment Only
04/18/2019
Shaft wall framing and firestops of inner layer at 3floor for mechanical shaft... approved.

Framing Inspection Partial Pass 04/29/2019
Corrections:


Miscellaneous/Other
Comment Only
04/29/2019
Gypsum layers of 3rd floor shaft approved

Building Final Inspection Failed 5/9/2019 (10:00 - 12:00) 5/9/2019 (AM) 05/09/2019
Corrections:


Miscellaneous/Other
Comment Only
05/09/2019
Need to complete fire caulking and stencil corridor with “no storage by Fire Marshall”. Double door opening in wall will be filled in with wall and that will be transferred to the Apple buildout permit. Any firestops from any other penetrations Apple runs in the corridor will also get transferred to the Apple buildout permit.

Fire Inspection Final Passed 5/9/2019 (10:00 - 12:00) 5/9/2019 (AM) 05/10/2019
Framing Inspection Passed 5/15/2019 (2:30 - 3:30) 5/15/2019 (PM) 05/15/2019
Corrections:


Miscellaneous/Other
Comment Only
05/15/2019
The scope of work under this permit is approved for final. Any existing issues that need to still be completed as in the wall infill at cooridor and rated doors at the created storage space and column fireproofing protection, will be required for completion under the Apple tenant buildout permit.

Building Final Inspection Passed 12/10/2019
Corrections:


Miscellaneous/Other
Comment Only
12/10/2019
Final approved for this permit