Permit Application Status

PRBD201814439


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201814439
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
Framing work only for the Sugar Factory tenant space within the Mall of America.
11/20/2018
11/30/2018
05/11/2020

Locations

Permits

Permit Number: PRBD201814439

Building
Finaled
11/30/2018
05/11/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 1/11/2019 (10:00 - 12:00) 1/11/2019 (AM) 01/11/2019
Per Duke, must have demo inspection before framing inspection.
Corrections:


Miscellaneous/Other
Comment Only
01/11/2019
Viewed a shaft enclosure that contractor wants to partially demo and rebuild smaller in size. Ok to do this, inspection of the framing as it is builtneeds to be performed. Call in for all inspections.

Progress Inspection Failed 1/16/2019 (12:30 - 2:30) 1/16/2019 (PM) 01/16/2019
Corrections:


Miscellaneous/Other
Comment Only
01/16/2019
Need to complete through floor firestops in prep kitchen suite s255.

Framing Inspection Not Ready 1/17/2019 (2:30 - 3:30) 1/17/2019 (PM) 01/17/2019
Fire Inspection Final Passed 11/13/2019
Corrections:


Miscellaneous/Other
Comment Only
11/13/2019
See permit 201813974 for inspection results

Framing Inspection Passed 11/13/2019
Corrections:


Miscellaneous/Other
Comment Only
11/13/2019
See permit 201813974 for inspection results

Building Final Inspection Passed w/ Conditions 11/13/2019
Corrections:


Miscellaneous/Other
Comment Only
11/13/2019
Final for this framing permit only... approved See permit 201813974 for inspection results.