Permit Application Status

PRBD201815604


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201815604
Building
Finaled
RWIC OFFICE PARTNERSHIP
Alteration/Repair/Replace
Not Required
Lower level tenant lounge refresh and 3rd floor spec suites
12/30/2018
01/10/2019
11/19/2019

Locations

Permits

Permit Number: PRBD201815604

Building
Finaled
01/10/2019
11/19/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Passed 2/28/2019 (12:30 - 2:30) 2/28/2019 (PM) 02/28/2019
Parking garage and upper floor of building.
Corrections:


Miscellaneous/Other
Outstanding
02/28/2019
Framing approved. Call for above ceiling - Patch steel beam fireproofing in ceiling of tenant remodel 3rd floor, both suites. Fire caulk corridor walls and above ceiling wall penetrations, for both tenant spaces on each side of 1 hr rated corridor..

Miscellaneous/Other
Outstanding
02/28/2019

Building Final Inspection Passed 5/3/2019 (8:00 - 10:00) 5/3/2019 (AM) 05/03/2019
Parking ramp entry to elevator lobby - add exit sign on exit path into stairwell exit door, and smoke gaskets on older existing 90 minute rated door, into sprinklered parking ramp. Contractor performing work as inspector is leaving site.
Fire Inspection Final Not Ready 5/3/2019 (8:00 - 10:00) 5/3/2019 (AM) 05/06/2019
Fire Inspection Final Passed 05/23/2019
Above Ceiling Inspection VOID 02/06/2020
Fire Rated Assemblies Inspection VOID 02/06/2020
1 hour rated corridor, and patch fireproofing on ceiling steel beams.